# Create a new production routing
In this article, we take you through the steps to use the Contoso Coffee demo data to manually set up a new production routing in Business Central.
## Scenario for the New Path routing
Oscar, the process engineer, at Contoso Coffee, decides to create a new routing with the name New Path. Because this routing is unlike any other routing at Contoso Coffee, Oscar must manually enter all of the information for the routing.
## Create and certify the production routing
1. Create the routing header.
 1. Select Search (Alt+Q) in the upper-right corner, enter routings, and then choose the related link.
 1. Choose the New action, and then fill in the fields as described in the following table.
  Field|Value
  No.|1099
  Description|New Path
1. Create the routing lines.
 1. On the Lines FastTab, add a new line, and then fill in the fields as described in the following table.
  Field|Value
  Operation No.|10
  Type|Work Center
  No.|100
  Setup Time|20
  Run Time|15
 1. Add a new line, and then fill in the fields as described in the following table.
  Field|Value
  Operation No.|20
  Type|Work Center
  No.|200
  Setup Time|30
  Run Time|5
1. Certify the routing.
 1. In the Status field, choose Certified.
The new routing is now set up.
## Related information
Introduction to Contoso Coffee Demo Data<../contoso-coffee-intro>
Find free e-learning modules for Business Central here<https://learn.microsoft.com/training/dynamics365/business-central>

Copyright (c) Microsoft Corporation. CC BY 4.0, https://creativecommons.org/licenses/by/4.0/; code samples MIT. From https://learn.microsoft.com/en-us/dynamics365/business-central/contoso-coffee/manufacturing/create-new-routing, MicrosoftDocs/dynamics365smb-docs at 46907ac (2026-11-19). Changed: includes filled in, links to this site, and for agents shortened without dropping a fact. https://jonas-paprotka.de/docs/contoso-coffee/manufacturing/create-new-routing/
