{"title":"Use different component supply methods in subcontracting","url":"https://jonas-paprotka.de/docs/contoso-coffee/manufacturing/subcontracting-component-supply-methods/","by":"JOP-AL","license":"Copyright (c) Microsoft Corporation. CC BY 4.0, https://creativecommons.org/licenses/by/4.0/; code samples MIT. From https://learn.microsoft.com/en-us/dynamics365/business-central/contoso-coffee/manufacturing/subcontracting-component-supply-methods, MicrosoftDocs/dynamics365smb-docs at 46907ac (2026-11-19). Changed: includes filled in, links to this site, and for agents shortened without dropping a fact.","credit":"Microsoft Corporation, CC BY 4.0","origin":"https://learn.microsoft.com/en-us/dynamics365/business-central/contoso-coffee/manufacturing/subcontracting-component-supply-methods","source":{"name":"Business Central application docs","repo":"https://github.com/MicrosoftDocs/dynamics365smb-docs","commit":"46907ace177f8d31deba47a2fdb57c3336e66252","date":"2026-11-19"},"checked":"2026-11-19","description":"Walkthrough to learn how the three component supply methods work in subcontracting and how they affect planning in Business Central.","date":"2026-11-12","meta":{"topic":"how-to"},"outline":[{"level":1,"title":"Use different component supply methods in subcontracting","slug":"use-different-component-supply-methods-in-subcontracting","at":0,"chars":8572},{"level":2,"title":"Scenario for supplying Airpot components to a subcontractor","slug":"scenario-for-supplying-airpot-components-to-a-subcontractor","at":373,"chars":592},{"level":2,"title":"Prerequisites","slug":"prerequisites","at":965,"chars":858},{"level":2,"title":"Set up the demo data","slug":"set-up-the-demo-data","at":1823,"chars":6368},{"level":3,"title":"Assign the routing and configure the BOM","slug":"assign-the-routing-and-configure-the-bom","at":1847,"chars":1615},{"level":3,"title":"Set the subcontracting location code on the vendor","slug":"set-the-subcontracting-location-code-on-the-vendor","at":3462,"chars":672},{"level":3,"title":"Create the production order","slug":"create-the-production-order","at":4134,"chars":397},{"level":3,"title":"Review how components are set up","slug":"review-how-components-are-set-up","at":4531,"chars":714},{"level":3,"title":"Explore how planning handles each method","slug":"explore-how-planning-handles-each-method","at":5245,"chars":1514},{"level":3,"title":"Create the subcontracting order and process the transfer","slug":"create-the-subcontracting-order-and-process-the-transfer","at":6759,"chars":703},{"level":3,"title":"Receive the subcontracting output","slug":"receive-the-subcontracting-output","at":7462,"chars":729},{"level":2,"title":"Related information","slug":"related-information","at":8191,"chars":381}],"text":"# Use different component supply methods in subcontracting\nThis article illustrates how the three component supply methods work in the Subcontracting app. Using the Contoso Coffee demo data, you set up a production BOM where different components reach the subcontractor through different channels. Then, you explore how the planning system handles each method differently.\n## Scenario for supplying Airpot components to a subcontractor\nYou produce the SP-SCM1009, Airpot at Contoso Coffee. A subcontractor handles the full assembly. Different components reach the subcontractor through different channels:\n Housing: you transfer it from your warehouse to the subcontractor.\n Circuit board: you order it from your supplier and have it delivered directly to the subcontractor's location.\n Power cord: the subcontractor provides it. You don't need to plan for it.\nYou want to know how Business Central handles each supply method in planning and on the purchase order.\n## Prerequisites\nTo run this scenario, you need:\n The Manufacturing module generated in Contoso Demo Tool, including its automatically posted opening inventory. See contoso-coffee-manufacturing-intro#set-up-contoso-coffee-manufacturing-data.\n The Subcontracting app installed from Marketplace. Here's a link to the app's download page<https://marketplace.microsoft.com/product/PUBID.microsoftdynsmb%7CAID.subcontracting%7CPAPPID.1f32a50d-0057-4b95-b5df-cc04d7e89470>.\n> IMPORTANT\n> This scenario changes the routing to SP-SCM1009-SUB-F and sets different component supply methods on the BOM. If you previously ran set-up-process-subcontracting-operation, clear the Routing Link Code and Component Supply Method for SP-BOM1102, Coffee filter basket. Then configure the three components described in this walkthrough. Leave the other BOM components unchanged.\n## Set up the demo data\n### Assign the routing and configure the BOM\n1. Select Search (Alt+Q) in the upper-right corner, enter Items, and then select the related link.\n1. Open the item card page for SP-SCM1009, Airpot.\n1. On the Replenishment FastTab, verify or set the Routing No. field to SP-SCM1009-SUB-F.\n This routing has a single subcontracting operation on Work Center 600 (Local Assembly), which is linked to vendor 83000, Local Assembly. The single operation keeps the focus on component supply rather than routing complexity.\n1. On the item card page, select the Production BOM action to open BOM SP-SCM1009.\n1. In the Status field, choose Under Development.\n1. On the Lines FastTab, configure the following components:\n For SP-BOM1101, Housing Airpot:\n Field|Value\n Routing Link Code|500\n Component Supply Method|Transfer to Vendor\n You transfer this component from your MAIN warehouse to the subcontractor. Business Central creates a transfer order when you process the production order.\n For SP-BOM1107, Circuit board, set the following fields:\n Field|Value\n Routing Link Code|500\n Component Supply Method|Consignment at Vendor\n You purchase this component, but it's delivered directly to the subcontractor's location. The planning system creates purchase demand at the subcontracting location.\n For SP-BOM1108, Power cord, fill in the following fields:\n Field|Value\n Routing Link Code|500\n Component Supply Method|Vendor-Supplied\n The subcontractor provides this component. Production demand for this vendor-supplied component is excluded from planning.\n1. In the Status field, choose Certified.\n1. Close the production BOM.\n### Set the subcontracting location code on the vendor\n1. Select Search (Alt+Q) in the upper-right corner, enter Vendors, and then select the related link.\n1. Open the vendor card page for 83000, Local Assembly.\n1. In the Subcontracting Location Code field, enter S83000.\n The demo data creates location S83000, Local Assembly, but you must assign it to the vendor. This scenario uses a different vendor from the set-up-process-subcontracting-operation scenario. This field tells Business Central where the subcontractor's facility is located. Without this information, the production order refresh fails because Business Central can't determine where to send components.\n### Create the production order\n1. Select Search (Alt+Q) in the upper-right corner, enter Released Production Orders, and then select the related link.\n1. Select the New action, and then fill in the fields as described in the following table.\n Field|Value\n Source Type|Item\n Source No.|SP-SCM1009\n Quantity|10\n Location Code|MAIN\n1. Select the Refresh Production Order action, and then select OK.\n### Review how components are set up\n1. On the production order, select the Components action.\n1. Notice the differences in the Location Code column:\n Component|Location Code|Why\n SP-BOM1101 (Housing)|MAIN|Transfer from MAIN to the subcontractor\n SP-BOM1107 (Circuit board)|S83000|Purchased and delivered directly to the subcontracting location\n SP-BOM1108 (Power cord)|S83000|Vendor supplied, excluded from planning\n The location code shows where the component needs to be before the subcontracting operation starts.\n1. For each of these components, set the Flushing Method field to Backward. This setting ensures that component consumption posts automatically when you receive the output from the subcontractor.\n### Explore how planning handles each method\n1. Select Search (Alt+Q) in the upper-right corner, enter Planning Worksheets, and then select the related link.\n1. Select the Calculate Regenerative Plan action.\n1. On the request page, set the Item Filter to `SP-BOM1101|SP-BOM1107|SP-BOM1108` to focus on the three components. Select a planning period that includes the production order's component requirement dates, and then select OK.\n1. Review the results:\n  SP-BOM1107 (Circuit board): the planning system suggests a purchase order with S83000 in the Location Code field. The component is delivered directly to the subcontractor. Standard purchase planning rules (reorder policy, safety stock) apply to this location.\n  SP-BOM1101 (Housing): demand remains at MAIN until you transfer the component to the subcontractor. Planning can suggest replenishment at MAIN if available inventory doesn't cover demand. The subcontracting transfer is created separately from the purchase order.\n  SP-BOM1108 (Power cord): no planning line is created for the vendor-supplied demand from this production order. Other demand for this item can still require planning.\n1. Select the planning line for SP-BOM1107 (Circuit board) and choose the Carry Out Action Message action. This action creates a purchase order for the circuit board at location S83000.\n1. Open the purchase order for SP-BOM1107 and post the receipt. This makes the circuit board available at the subcontractor's location before the subcontracting work begins.\n### Create the subcontracting order and process the transfer\n1. Go back to the production order and select the Routing action.\n1. Select the subcontracting operation, and select Functions, Create Subcontracting Order.\n1. Open the purchase order. On the Lines FastTab, the vendor-supplied component (SP-BOM1108) appears on the purchase order alongside the subcontracting work line.\n1. Select Create Transf. Ord. to Subcontractor in the Subcontracting action group.\n A transfer order is created only for SP-BOM1101 (Housing). The circuit board (consignment at vendor) is handled through separate purchase planning, and the power cord (vendor supplied) doesn't need a transfer.\n1. Post the transfer order.\n### Receive the subcontracting output\n1. On the purchase order, select the Post action, and then select Receive.\n1. To verify component consumption, select Search (Alt+Q) in the upper-right corner, enter Item Ledger Entries, and then select the related link. Filter on the production order number and then choose Consumption in the Entry Type field.\n Consumption entries display for all three components, posted from location S83000 (the subcontracting location). The housing was transferred there earlier, the circuit board was purchased directly to that location, and the power cord is vendor-supplied at that location. The backward flushing method posted consumption automatically when the subcontracting output was received.\n## Related information\ncontoso-coffee-manufacturing-intro\nset-up-process-subcontracting-operation\nSet Up Subcontracting Prices and Allocate Item Charges<subcontracting-pricing-item-charges>\nSubcontracting overview</production-how-to-subcontract-manufacturing>\nFind free e-learning modules for Business Central here<https://learn.microsoft.com/training/dynamics365/business-central>"}