# Report generation and cancellation flow
This following figure illustrates the process that occurs when a report is generated.
![Report generation.]
## Evaluate Cancellation
There are several operations and events that can initiate a request on the server to cancel a report. Some of these operations and events are invoked by the user, while others by the server itself. The server doesn't cancel a report immediately. Instead, every five seconds it evaluates the status of cancellation requests. The following diagram illustrates the flow for this subprocess:
This flow means a report isn't necessarily canceled when a limit is exceeded. For example, if the maximum number of rows is exceeded, the report won't be canceled as long as it completes within the five-second interval.
> NOTE
> The report rendering is not included in the evaluate cancellation process and can't be canceled.
## Related information
Configuring Business Central Server<configure-server-instance>
Analyzing Report Telemetry<telemetry-reports-trace>

Copyright (c) Microsoft Corporation. CC BY 4.0, https://creativecommons.org/licenses/by/4.0/; code samples MIT. From https://learn.microsoft.com/en-us/dynamics365/business-central/dev-itpro/administration/report-cancellation, MicrosoftDocs/dynamics365smb-devitpro-pb at 828b6ee (2026-11-19). Changed: includes filled in, links to this site, and for agents shortened without dropping a fact. https://jonas-paprotka.de/docs/dev-itpro/administration/report-cancellation/
