{"title":"Finished production order breakdown (Power BI report)","url":"https://jonas-paprotka.de/docs/manufacturing-powerbi-finished-production-order-breakdown/","by":"JOP-AL","license":"Copyright (c) Microsoft Corporation. CC BY 4.0, https://creativecommons.org/licenses/by/4.0/; code samples MIT. From https://learn.microsoft.com/en-us/dynamics365/business-central/manufacturing-powerbi-finished-production-order-breakdown, MicrosoftDocs/dynamics365smb-docs at 46907ac (2026-11-19). Changed: includes filled in, links to this site, and for agents shortened without dropping a fact.","credit":"Microsoft Corporation, CC BY 4.0","origin":"https://learn.microsoft.com/en-us/dynamics365/business-central/manufacturing-powerbi-finished-production-order-breakdown","source":{"name":"Business Central application docs","repo":"https://github.com/MicrosoftDocs/dynamics365smb-docs","commit":"46907ace177f8d31deba47a2fdb57c3336e66252","date":"2026-11-19"},"checked":"2026-11-19","description":"The Finished Production Order Breakdown report provides insights into the expected quantity versus the finished quantity of production orders.","date":"2026-11-12","meta":{"topic":"concept-article"},"outline":[{"level":1,"title":"Finished production order breakdown (Power BI report)","slug":"finished-production-order-breakdown-power-bi-report","at":0,"chars":3011},{"level":2,"title":"Use the report","slug":"use-the-report","at":425,"chars":446},{"level":2,"title":"Key performance indicators (KPIs)","slug":"key-performance-indicators-kpis","at":871,"chars":1137},{"level":2,"title":"Data used in the report","slug":"data-used-in-the-report","at":2008,"chars":286},{"level":2,"title":"Try the report","slug":"try-the-report","at":2294,"chars":336},{"level":2,"title":"Related information","slug":"related-information","at":2630,"chars":381}],"text":"# Finished production order breakdown (Power BI report)\n> APPLIES TO: Generally available in Business Central 2024 release wave 2.\nThe Finished Production Order Breakdown report compares planned and finished quantities for production orders with the Finished status. It also breaks down actual costs and compares them with expected and standard costs.\n![Screenshot of the Finished Production Order Breakdown Power BI Report]\n## Use the report\nThe report is meant for manufacturing managers and supervisors.\nManufacturing managers use the report to review completed production orders. Comparing planned and finished quantities helps identify output variances. The cost breakdown helps you evaluate the cost of completed production.\nProduction supervisors use this report to investigate discrepancies between planned and finished quantities on completed production orders.\n## Key performance indicators (KPIs)\nThe Finished Production Order Breakdown report includes the following KPIs and measures:\n manufacturing-powerbi-kpis#planned-quantity\n manufacturing-powerbi-kpis#finished-quantity\n manufacturing-powerbi-kpis#variance-quantity\n manufacturing-powerbi-kpis#actual-material-cost\n manufacturing-powerbi-kpis#actual-capacity-cost\n manufacturing-powerbi-kpis#actual-capacity-overhead-cost\n manufacturing-powerbi-kpis#actual-manufacturing-overhead-cost\n manufacturing-powerbi-kpis#actual-subcontracted-cost\n manufacturing-powerbi-kpis#total-actual-cost\n manufacturing-powerbi-kpis#total-expected-cost-variance\n manufacturing-powerbi-kpis#total-standard-cost-variance\n manufacturing-powerbi-kpis#total-expected-cost-dev-percent\n manufacturing-powerbi-kpis#total-standard-cost-dev-percent\nClick on the link for a KPI to learn more about what it means, how it is calculated, and what data was used in the calculations.\n> TIP\n> You can easily track the KPIs that the Power BI reports display against your business objectives. See Track your business KPIs with Power BI metrics<track-kpis-with-power-bi-metrics>.\n## Data used in the report\nThe report uses data from the following tables in Business Central:\n Item\n Production Order\n Prod. Order Line\n Capacity Ledger Entry\n Item Ledger Entry\n Value Entry\n Inventory Adjmt. Entry (Order)\n Prod. Order Component\n Prod. Order Routing Line\n Work Center\n## Try the report\nTry the report here: Finished Production Order Breakdown<https://businesscentral.dynamics.com?page=37045>\n> TIP\n> If you hold down the Ctrl key while you select the report link, the report opens on a new browser tab. The new tab lets you stay on the current page while you explore the report on the other browser tab.\n## Related information\nTrack your business KPIs with Power BI goals<track-kpis-with-power-bi-metrics>\nPower BI Manufacturing app<manufacturing-powerbi-app>\nBuilt-in production reports<production-reports>\nManufacturing overview<production-manage-manufacturing>\nFind free e-learning modules for Business Central here<https://learn.microsoft.com/training/dynamics365/business-central>"}