{"title":"Power BI Manufacturing app KPIs and measures","url":"https://jonas-paprotka.de/docs/manufacturing-powerbi-kpis/","by":"JOP-AL","license":"Copyright (c) Microsoft Corporation. CC BY 4.0, https://creativecommons.org/licenses/by/4.0/; code samples MIT. From https://learn.microsoft.com/en-us/dynamics365/business-central/manufacturing-powerbi-kpis, MicrosoftDocs/dynamics365smb-docs at 46907ac (2026-11-19). Changed: includes filled in, links to this site, and for agents shortened without dropping a fact.","credit":"Microsoft Corporation, CC BY 4.0","origin":"https://learn.microsoft.com/en-us/dynamics365/business-central/manufacturing-powerbi-kpis","source":{"name":"Business Central application docs","repo":"https://github.com/MicrosoftDocs/dynamics365smb-docs","commit":"46907ace177f8d31deba47a2fdb57c3336e66252","date":"2026-11-19"},"checked":"2026-11-19","description":"Learn how the Manufacturing Power BI app calculates production quantities, time, capacity, costs, scrap, variances, and work-in-progress measures.","date":"2026-11-12","meta":{"topic":"reference"},"outline":[{"level":1,"title":"Power BI Manufacturing app KPIs and measures","slug":"power-bi-manufacturing-app-kpis-and-measures","at":0,"chars":50540},{"level":2,"title":"Calendar entries","slug":"calendar-entries","at":757,"chars":414},{"level":3,"title":"Calendar entry measures","slug":"calendar-entry-measures","at":777,"chars":394},{"level":4,"title":"Capacity (effective)","slug":"capacity-effective","at":843,"chars":194},{"level":4,"title":"Capacity (total)","slug":"capacity-total","at":1037,"chars":134},{"level":2,"title":"Capacity ledger entries","slug":"capacity-ledger-entries","at":1171,"chars":2404},{"level":3,"title":"Capacity ledger entry measures","slug":"capacity-ledger-entry-measures","at":1198,"chars":2377},{"level":4,"title":"Capacity ledger output quantity","slug":"capacity-ledger-output-quantity","at":1393,"chars":219},{"level":4,"title":"Capacity ledger quantity","slug":"capacity-ledger-quantity","at":1612,"chars":199},{"level":4,"title":"Direct cost","slug":"direct-cost","at":1811,"chars":318},{"level":4,"title":"Overhead cost","slug":"overhead-cost","at":2129,"chars":324},{"level":4,"title":"Run time","slug":"run-time","at":2453,"chars":230},{"level":4,"title":"Scrap percent","slug":"scrap-percent","at":2683,"chars":215},{"level":4,"title":"Scrap quantity","slug":"scrap-quantity","at":2898,"chars":211},{"level":4,"title":"Setup time","slug":"setup-time","at":3109,"chars":234},{"level":4,"title":"Stop time","slug":"stop-time","at":3343,"chars":232},{"level":2,"title":"Item ledger entries","slug":"item-ledger-entries","at":3575,"chars":952},{"level":3,"title":"Item ledger entry measures","slug":"item-ledger-entry-measures","at":3598,"chars":929},{"level":4,"title":"Consumption quantity","slug":"consumption-quantity","at":3720,"chars":215},{"level":4,"title":"Item ledger entry cost amount actual","slug":"item-ledger-entry-cost-amount-actual","at":3935,"chars":214},{"level":4,"title":"Output quantity","slug":"output-quantity","at":4149,"chars":205},{"level":4,"title":"Quantity","slug":"quantity","at":4354,"chars":173},{"level":2,"title":"Machine center","slug":"machine-center","at":4527,"chars":4511},{"level":3,"title":"Machine center measures","slug":"machine-center-measures","at":4545,"chars":2271},{"level":4,"title":"Machine center availability after orders","slug":"machine-center-availability-after-orders","at":4799,"chars":268},{"level":4,"title":"Machine center load","slug":"machine-center-load","at":5067,"chars":259},{"level":4,"title":"Machine center output","slug":"machine-center-output","at":5326,"chars":263},{"level":4,"title":"Machine center run time","slug":"machine-center-run-time","at":5589,"chars":283},{"level":4,"title":"Machine center scrap","slug":"machine-center-scrap","at":5872,"chars":260},{"level":4,"title":"Machine center scrap percent","slug":"machine-center-scrap-percent","at":6132,"chars":202},{"level":4,"title":"Machine center stop percent","slug":"machine-center-stop-percent","at":6334,"chars":211},{"level":4,"title":"Machine center stop time","slug":"machine-center-stop-time","at":6545,"chars":271},{"level":3,"title":"Machine center statistics","slug":"machine-center-statistics","at":6816,"chars":2222},{"level":4,"title":"Machine center actual efficiency percent","slug":"machine-center-actual-efficiency-percent","at":7098,"chars":242},{"level":4,"title":"Machine center actual need","slug":"machine-center-actual-need","at":7340,"chars":297},{"level":4,"title":"Machine center actual total cost","slug":"machine-center-actual-total-cost","at":7637,"chars":301},{"level":4,"title":"Machine center allocated time","slug":"machine-center-allocated-time","at":7938,"chars":310},{"level":4,"title":"Machine center capacity (effective)","slug":"machine-center-capacity-effective","at":8248,"chars":284},{"level":4,"title":"Machine center capacity (total)","slug":"machine-center-capacity-total","at":8532,"chars":276},{"level":4,"title":"Machine center expected efficiency percent","slug":"machine-center-expected-efficiency-percent","at":8808,"chars":230},{"level":2,"title":"Prod order capacity need","slug":"prod-order-capacity-need","at":9038,"chars":793},{"level":3,"title":"Prod order capacity need measures","slug":"prod-order-capacity-need-measures","at":9066,"chars":765},{"level":4,"title":"Allocated time","slug":"allocated-time","at":9152,"chars":268},{"level":4,"title":"Needed time","slug":"needed-time","at":9420,"chars":170},{"level":4,"title":"Needed time (MS)","slug":"needed-time-ms","at":9590,"chars":241},{"level":2,"title":"Prod order components","slug":"prod-order-components","at":9831,"chars":887},{"level":3,"title":"Prod order component measures","slug":"prod-order-component-measures","at":9856,"chars":862},{"level":4,"title":"Prod order component cost amount","slug":"prod-order-component-cost-amount","at":10008,"chars":207},{"level":4,"title":"Prod order component expected qty. (base)","slug":"prod-order-component-expected-qty-base","at":10215,"chars":250},{"level":4,"title":"Prod order component remaining qty. (base)","slug":"prod-order-component-remaining-qty-base","at":10465,"chars":253},{"level":2,"title":"Prod order routing lines","slug":"prod-order-routing-lines","at":10718,"chars":3342},{"level":3,"title":"Prod order routing measures","slug":"prod-order-routing-measures","at":10746,"chars":3314},{"level":4,"title":"Expected operation cost","slug":"expected-operation-cost","at":11104,"chars":298},{"level":4,"title":"Operation move time","slug":"operation-move-time","at":11402,"chars":208},{"level":4,"title":"Operation run time","slug":"operation-run-time","at":11610,"chars":205},{"level":4,"title":"Operation setup time","slug":"operation-setup-time","at":11815,"chars":211},{"level":4,"title":"Operation wait time","slug":"operation-wait-time","at":12026,"chars":208},{"level":4,"title":"Posted output quantity","slug":"posted-output-quantity","at":12234,"chars":263},{"level":4,"title":"Prod order routing expected capacity need","slug":"prod-order-routing-expected-capacity-need","at":12497,"chars":263},{"level":4,"title":"Prod order routing expected capacity ovhd. cost","slug":"prod-order-routing-expected-capacity-ovhd-cost","at":12760,"chars":277},{"level":4,"title":"Prod order routing expected operation cost amt","slug":"prod-order-routing-expected-operation-cost-amt","at":13037,"chars":275},{"level":4,"title":"Total duration days","slug":"total-duration-days","at":13312,"chars":372},{"level":4,"title":"Total duration hours","slug":"total-duration-hours","at":13684,"chars":376},{"level":2,"title":"Production order lines","slug":"production-order-lines","at":14060,"chars":774},{"level":3,"title":"Production order line measures","slug":"production-order-line-measures","at":14086,"chars":748},{"level":4,"title":"Finished quantity (base)","slug":"finished-quantity-base","at":14188,"chars":224},{"level":4,"title":"Quantity (base)","slug":"quantity-base","at":14412,"chars":195},{"level":4,"title":"Remaining quantity (base)","slug":"remaining-quantity-base","at":14607,"chars":227},{"level":2,"title":"Production orders","slug":"production-orders","at":14834,"chars":28289},{"level":3,"title":"Production order measures","slug":"production-order-measures","at":14855,"chars":3139},{"level":4,"title":"Actual time used","slug":"actual-time-used","at":15133,"chars":396},{"level":4,"title":"Average production time per finished quantity","slug":"average-production-time-per-finished-quantity","at":15529,"chars":244},{"level":4,"title":"Expected production order scrap quantity","slug":"expected-production-order-scrap-quantity","at":15773,"chars":283},{"level":4,"title":"Finished percent","slug":"finished-percent","at":16056,"chars":221},{"level":4,"title":"Finished quantity","slug":"finished-quantity","at":16277,"chars":290},{"level":4,"title":"No. of production orders","slug":"no-of-production-orders","at":16567,"chars":180},{"level":4,"title":"Planned quantity","slug":"planned-quantity","at":16747,"chars":108},{"level":4,"title":"Production order scrap quantity","slug":"production-order-scrap-quantity","at":16855,"chars":277},{"level":4,"title":"Production order scrap percent","slug":"production-order-scrap-percent","at":17132,"chars":181},{"level":4,"title":"Remaining percent","slug":"remaining-percent","at":17313,"chars":432},{"level":4,"title":"Variance quantity","slug":"variance-quantity","at":17745,"chars":249},{"level":3,"title":"Production order statistics","slug":"production-order-statistics","at":17994,"chars":25129},{"level":4,"title":"Actual costs","slug":"actual-costs","at":18026,"chars":5121},{"level":5,"title":"Actual capacity cost","slug":"actual-capacity-cost","at":18207,"chars":1457},{"level":5,"title":"Actual capacity overhead cost","slug":"actual-capacity-overhead-cost","at":19664,"chars":224},{"level":5,"title":"Actual manufacturing overhead cost","slug":"actual-manufacturing-overhead-cost","at":19888,"chars":1113},{"level":5,"title":"Actual material cost","slug":"actual-material-cost","at":21001,"chars":385},{"level":5,"title":"Actual subcontracted cost","slug":"actual-subcontracted-cost","at":21386,"chars":1292},{"level":5,"title":"Total actual cost","slug":"total-actual-cost","at":22678,"chars":469},{"level":4,"title":"Capacity need","slug":"capacity-need","at":23147,"chars":4663},{"level":5,"title":"Prod order actual capacity need","slug":"prod-order-actual-capacity-need","at":23405,"chars":1235},{"level":5,"title":"Prod order capacity need dev percent","slug":"prod-order-capacity-need-dev-percent","at":24640,"chars":423},{"level":5,"title":"Prod order capacity need variance","slug":"prod-order-capacity-need-variance","at":25063,"chars":438},{"level":5,"title":"Prod order expected capacity need","slug":"prod-order-expected-capacity-need","at":25501,"chars":520},{"level":5,"title":"Prod order expected capacity need (finished)","slug":"prod-order-expected-capacity-need-finished","at":26021,"chars":858},{"level":5,"title":"Prod order expected capacity need (non finished)","slug":"prod-order-expected-capacity-need-non-finished","at":26879,"chars":931},{"level":4,"title":"Expected costs","slug":"expected-costs","at":27810,"chars":7641},{"level":5,"title":"Expected capacity cost","slug":"expected-capacity-cost","at":28005,"chars":249},{"level":5,"title":"Expected capacity overhead cost","slug":"expected-capacity-overhead-cost","at":28254,"chars":349},{"level":5,"title":"Expected manufacturing overhead cost","slug":"expected-manufacturing-overhead-cost","at":28603,"chars":960},{"level":5,"title":"Expected material cost","slug":"expected-material-cost","at":29563,"chars":301},{"level":5,"title":"Expected subcontracted cost","slug":"expected-subcontracted-cost","at":29864,"chars":792},{"level":5,"title":"Total expected cost","slug":"total-expected-cost","at":30656,"chars":472},{"level":5,"title":"Variance to expected cost","slug":"variance-to-expected-cost","at":31128,"chars":2029},{"level":6,"title":"Expected capacity cost variance","slug":"expected-capacity-cost-variance","at":31389,"chars":268},{"level":6,"title":"Expected capacity overhead cost variance","slug":"expected-capacity-overhead-cost-variance","at":31657,"chars":220},{"level":6,"title":"Expected manufacturing overhead cost variance","slug":"expected-manufacturing-overhead-cost-variance","at":31877,"chars":307},{"level":6,"title":"Expected material cost variance","slug":"expected-material-cost-variance","at":32184,"chars":180},{"level":6,"title":"Expected subcontracted cost variance","slug":"expected-subcontracted-cost-variance","at":32364,"chars":280},{"level":6,"title":"Total expected cost variance","slug":"total-expected-cost-variance","at":32644,"chars":513},{"level":5,"title":"Variance to expected cost deviation %","slug":"variance-to-expected-cost-deviation","at":33157,"chars":2294},{"level":6,"title":"Expected capacity cost dev percent","slug":"expected-capacity-cost-dev-percent","at":33448,"chars":333},{"level":6,"title":"Expected capacity overhead cost dev percent","slug":"expected-capacity-overhead-cost-dev-percent","at":33781,"chars":299},{"level":6,"title":"Expected manufacturing overhead cost dev percent","slug":"expected-manufacturing-overhead-cost-dev-percent","at":34080,"chars":391},{"level":6,"title":"Expected material cost dev percent","slug":"expected-material-cost-dev-percent","at":34471,"chars":250},{"level":6,"title":"Expected subcontracted cost dev percent","slug":"expected-subcontracted-cost-dev-percent","at":34721,"chars":359},{"level":6,"title":"Total expected cost dev percent","slug":"total-expected-cost-dev-percent","at":35080,"chars":371},{"level":4,"title":"Standard costs","slug":"standard-costs","at":35451,"chars":7672},{"level":5,"title":"Standard capacity cost","slug":"standard-capacity-cost","at":35646,"chars":539},{"level":5,"title":"Standard capacity overhead cost","slug":"standard-capacity-overhead-cost","at":36185,"chars":559},{"level":5,"title":"Standard manufacturing overhead cost","slug":"standard-manufacturing-overhead-cost","at":36744,"chars":602},{"level":5,"title":"Standard material cost","slug":"standard-material-cost","at":37346,"chars":554},{"level":5,"title":"Standard subcontracted cost","slug":"standard-subcontracted-cost","at":37900,"chars":571},{"level":5,"title":"Total standard cost","slug":"total-standard-cost","at":38471,"chars":410},{"level":5,"title":"Variance to standard cost","slug":"variance-to-standard-cost","at":38881,"chars":1963},{"level":6,"title":"Standard capacity cost variance","slug":"standard-capacity-cost-variance","at":39142,"chars":227},{"level":6,"title":"Standard capacity overhead cost variance","slug":"standard-capacity-overhead-cost-variance","at":39369,"chars":253},{"level":6,"title":"Standard manufacturing overhead cost variance","slug":"standard-manufacturing-overhead-cost-variance","at":39622,"chars":301},{"level":6,"title":"Standard material cost variance","slug":"standard-material-cost-variance","at":39923,"chars":216},{"level":6,"title":"Standard subcontracted cost variance","slug":"standard-subcontracted-cost-variance","at":40139,"chars":242},{"level":6,"title":"Total standard cost variance","slug":"total-standard-cost-variance","at":40381,"chars":463},{"level":5,"title":"Variance to standard cost deviation %","slug":"variance-to-standard-cost-deviation","at":40844,"chars":2279},{"level":6,"title":"Standard capacity cost dev percent","slug":"standard-capacity-cost-dev-percent","at":41135,"chars":305},{"level":6,"title":"Standard capacity overhead cost dev percent","slug":"standard-capacity-overhead-cost-dev-percent","at":41440,"chars":341},{"level":6,"title":"Standard manufacturing overhead cost dev percent","slug":"standard-manufacturing-overhead-cost-dev-percent","at":41781,"chars":393},{"level":6,"title":"Standard material cost dev percent","slug":"standard-material-cost-dev-percent","at":42174,"chars":295},{"level":6,"title":"Standard subcontracted cost dev percent","slug":"standard-subcontracted-cost-dev-percent","at":42469,"chars":325},{"level":6,"title":"Total standard cost dev percent","slug":"total-standard-cost-dev-percent","at":42794,"chars":329},{"level":2,"title":"Value entries","slug":"value-entries","at":43123,"chars":3331},{"level":3,"title":"Production order - WIP","slug":"production-order---wip","at":43140,"chars":1399},{"level":4,"title":"Beginning balance value","slug":"beginning-balance-value","at":43268,"chars":358},{"level":4,"title":"Capacity value","slug":"capacity-value","at":43626,"chars":350},{"level":4,"title":"Consumption value","slug":"consumption-value","at":43976,"chars":263},{"level":4,"title":"Ending balance value","slug":"ending-balance-value","at":44239,"chars":300},{"level":3,"title":"Output value","slug":"output-value","at":44539,"chars":366},{"level":3,"title":"Value entry measures","slug":"value-entry-measures","at":44905,"chars":1549},{"level":4,"title":"Cost amount actual","slug":"cost-amount-actual","at":45135,"chars":166},{"level":4,"title":"Cost amount expected","slug":"cost-amount-expected","at":45301,"chars":172},{"level":4,"title":"Cost posted to G/L","slug":"cost-posted-to-gl","at":45473,"chars":185},{"level":4,"title":"Expected cost","slug":"expected-cost","at":45658,"chars":238},{"level":4,"title":"Expected cost posted to G/L","slug":"expected-cost-posted-to-gl","at":45896,"chars":204},{"level":4,"title":"Item ledger entry quantity","slug":"item-ledger-entry-quantity","at":46100,"chars":188},{"level":4,"title":"Valued quantity","slug":"valued-quantity","at":46288,"chars":166},{"level":2,"title":"Work center","slug":"work-center","at":46454,"chars":3705},{"level":3,"title":"Work center measures","slug":"work-center-measures","at":46469,"chars":1402},{"level":4,"title":"Work center availability after orders","slug":"work-center-availability-after-orders","at":46622,"chars":282},{"level":4,"title":"Work center load","slug":"work-center-load","at":46904,"chars":274},{"level":4,"title":"Work center output","slug":"work-center-output","at":47178,"chars":238},{"level":4,"title":"Work center scrap","slug":"work-center-scrap","at":47416,"chars":236},{"level":4,"title":"Work center scrap percent","slug":"work-center-scrap-percent","at":47652,"chars":219},{"level":3,"title":"Work center statistics","slug":"work-center-statistics","at":47871,"chars":2288},{"level":4,"title":"Work center actual efficiency percent","slug":"work-center-actual-efficiency-percent","at":48155,"chars":229},{"level":4,"title":"Work center actual need","slug":"work-center-actual-need","at":48384,"chars":265},{"level":4,"title":"Work center actual total cost","slug":"work-center-actual-total-cost","at":48649,"chars":190},{"level":4,"title":"Work center allocated time","slug":"work-center-allocated-time","at":48839,"chars":280},{"level":4,"title":"Work center capacity (effective)","slug":"work-center-capacity-effective","at":49119,"chars":278},{"level":4,"title":"Work center capacity (total)","slug":"work-center-capacity-total","at":49397,"chars":270},{"level":4,"title":"Work center expected efficiency percent","slug":"work-center-expected-efficiency-percent","at":49667,"chars":218},{"level":4,"title":"Work center needed time","slug":"work-center-needed-time","at":49885,"chars":274},{"level":2,"title":"Related information","slug":"related-information","at":50159,"chars":381}],"text":"# Power BI Manufacturing app KPIs and measures\n> APPLIES TO: Generally available in Business Central 2024 release wave 2.\nThis article describes key performance indicators (KPIs), measures, and related fields in the semantic model for the Power BI Manufacturing report.\nExplore the list of KPIs to learn more about how they can help you achieve your business goals. Each KPI is described, including how it's calculated and what data is used in the calculations.\nFor measures that convert time or capacity units, Manufacturing Setup supplies the Show Capacity In unit and Time Factors supplies conversion factors. Measures based on work center units also use Work Center data. These are dependencies in addition to the transaction data sources listed below.\n## Calendar entries\n### Calendar entry measures\n #capacity-effective\n #capacity-total\n#### Capacity (effective)\nFormula\n Calculates the total effective capacity from the Calendar Entries table by summing up all values in the Capacity Effective column.\nData Source\n Calendar Entry\n#### Capacity (total)\nFormula\n Calculates total capacity by summing Capacity Total from Calendar Entries.\nData Source\n Calendar Entry\n## Capacity ledger entries\n### Capacity ledger entry measures\n #capacity-ledger-output-quantity\n #capacity-ledger-quantity\n #direct-cost\n #overhead-cost\n #run-time\n #scrap-percent\n #scrap-quantity\n #setup-time\n #stop-time\n#### Capacity ledger output quantity\nFormula\n Calculates the total output quantity recorded in the Capacity Ledger Entries table by summing up all values in the outputQuantity column.\nData Source\n Capacity Ledger Entry\n#### Capacity ledger quantity\nFormula\n Calculates the total quantity recorded in the Capacity Ledger Entries table by summing up all values in the Quantity column.\nData Source\n Capacity Ledger Entry\n#### Direct cost\nFormula\n Calculates the cost amount actual from the Value Entries table, specifically filtering for entries categorized as Direct Cost.\nThis measure determines the direct cost for capacity ledger entries by summing the related value entry cost amounts.\nData Source\n Capacity Ledger Entry\n Value Entry\n#### Overhead cost\nFormula\n Calculates the cost amount actual from the Value Entries table, specifically filtering for entries categorized as Indirect Cost.\nThis measure determines the indirect cost for capacity ledger entries by summing the related value entry cost amounts.\nData Source\n Capacity Ledger Entry\n Value Entry\n#### Run time\nFormula\n Sums runTime from Capacity Ledger Entries after converting each entry's capacity unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Capacity Ledger Entry\n#### Scrap percent\nFormula\n Calculates the percentage of scrapped output by dividing the Scrap Quantity by the total Output Quantity recorded in the Capacity Ledger Entries table.\nData Source\n Capacity Ledger Entry\n#### Scrap quantity\nFormula\n Calculates the total amount of scrapped output recorded in the Capacity Ledger Entries table by summing up all values in the scrapQuantity column.\nData Source\n Capacity Ledger Entry\n#### Setup time\nFormula\n Sums setupTime from Capacity Ledger Entries after converting each entry's capacity unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Capacity Ledger Entry\n#### Stop time\nFormula\n Sums stopTime from Capacity Ledger Entries after converting each entry's capacity unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Capacity Ledger Entry\n## Item ledger entries\n### Item ledger entry measures\n #consumption-quantity\n #item-ledger-entry-cost-amount-actual\n #output-quantity\n #quantity\n#### Consumption quantity\nFormula\n Calculates the total #quantity of item ledger entries where the Entry Type is Consumption by filtering the Item Ledger Entries table before summing.\nData Source\n Item Ledger Entry\n#### Item ledger entry cost amount actual\nFormula\n Calculates the total actual cost recorded in the Item Ledger Entries table by summing up all values in the costAmountActual column.\nData Source\n Item Ledger Entry\n#### Output quantity\nFormula\n Calculates the total #quantity of item ledger entries where the Entry Type is Output by filtering the Item Ledger Entries table before summing.\nData Source\n Item Ledger Entry\n#### Quantity\nFormula\n Sums the values in the Qty column of the Item Ledger Entries table to calculate the total quantity across all records.\nData Source\n Item Ledger Entry\n## Machine center\n### Machine center measures\n #machine-center-availability-after-orders\n #machine-center-load\n #machine-center-output\n #machine-center-run-time\n #machine-center-scrap\n #machine-center-scrap-percent\n #machine-center-stop-percent\n #machine-center-stop-time\n#### Machine center availability after orders\nFormula\n Calculates the remaining available capacity for machine centers by subtracting the #machine-center-allocated-time from the #machine-center-capacity-effective.\nData Source\n Prod Order Capacity Need\n Calendar Entry\n#### Machine center load\nFormula\n Calculates the ratio of allocated time to effective capacity for machine centers by dividing the #machine-center-allocated-time by the #machine-center-capacity-effective.\nData Source\n Prod Order Capacity Need\n Calendar Entry\n#### Machine center output\nFormula\n Calculates the total output quantity for machine centers by summing the outputQuantity column in the Capacity Ledger Entries table, filtered to include only rows where Type is Machine Center.\nData Source\n Capacity Ledger Entry\n#### Machine center run time\nFormula\n Sums runTime and setupTime from Capacity Ledger Entries where Type is Machine Center, converting each entry's capacity unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Capacity Ledger Entry\n#### Machine center scrap\nFormula\n Calculates the total scrap quantity for machine centers by summing the scrapQuantity column in the Capacity Ledger Entries table, filtered to include only rows where Type is Machine Center.\nData Source\n Capacity Ledger Entry\n#### Machine center scrap percent\nFormula\n Calculates the percentage of scrap for machine centers by dividing the #machine-center-scrap by the #machine-center-output.\nData Source\n Capacity Ledger Entry\n#### Machine center stop percent\nFormula\n Calculates the percentage of stop time for machine centers by dividing the #machine-center-stop-time by the #machine-center-run-time.\nData Source\n Capacity Ledger Entry\n#### Machine center stop time\nFormula\n Sums stopTime from Capacity Ledger Entries where Type is Machine Center, converting each entry's capacity unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Capacity Ledger Entry\n### Machine center statistics\n #machine-center-actual-efficiency-percent\n #machine-center-actual-need\n #machine-center-actual-total-cost\n #machine-center-allocated-time\n #machine-center-capacity-effective\n #machine-center-capacity-total\n #machine-center-expected-efficiency-percent\n#### Machine center actual efficiency percent\nFormula\n Calculates the actual efficiency for machine centers by dividing the #machine-center-actual-need by the #machine-center-capacity-total.\nData Source\n Capacity Ledger Entry\n Calendar Entry\n#### Machine center actual need\nFormula\n Sums setupTime, runTime, and stopTime from Capacity Ledger Entries where Type is Machine Center, converting each entry's capacity unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Capacity Ledger Entry\n#### Machine center actual total cost\nFormula\n Calculates the total actual cost for machine centers by adding the #direct-cost and #overhead-cost measures, filtered to include only rows in the Capacity Ledger Entries table where Type is Machine Center.\nData Source\n Capacity Ledger Entry\n Value Entry\n#### Machine center allocated time\nFormula\n Sums allocatedTime from Prod Order Capacity Need where Type is Machine Center and Requested Only is FALSE, converting each work center's unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Prod Order Capacity Need\n#### Machine center capacity (effective)\nFormula\n Sums Capacity Effective from Calendar Entries where Capacity Type is Machine Center, converting each work center's unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Calendar Entry\n#### Machine center capacity (total)\nFormula\n Sums Capacity Total from Calendar Entries where Capacity Type is Machine Center, converting each work center's unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Calendar Entry\n#### Machine center expected efficiency percent\nFormula\n Calculates the expected efficiency for machine centers by dividing the #machine-center-capacity-effective by the #machine-center-capacity-total.\nData Source\n Calendar Entry\n## Prod order capacity need\n### Prod order capacity need measures\n #allocated-time\n #needed-time\n #needed-time-ms\n#### Allocated time\nFormula\n Sums allocatedTime from Prod Order Capacity Need where Requested Only is FALSE, converting each work center's unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Prod Order Capacity Need\n#### Needed time\nFormula\n Divides #needed-time-ms by the Time Factor for the Show Capacity In unit selected in Manufacturing Setup.\nData Source\n Prod Order Capacity Need\n#### Needed time (MS)\nFormula\n Sums neededTimeMs from Prod Order Capacity Need. The result is in milliseconds; conversion to the selected capacity unit is performed by #needed-time.\nData Source\n Prod Order Capacity Need\n Manufacturing Setup\n## Prod order components\n### Prod order component measures\n #prod-order-component-cost-amount\n #prod-order-component-expected-qty-base\n #prod-order-component-remaining-qty-base\n#### Prod order component cost amount\nFormula\n Calculates the total cost of production order components by summing the costAmount column in the Prod Order Components table.\nData Source\n Prod Order Component\n#### Prod order component expected qty. (base)\nFormula\n Calculates the total expected quantity (in base units) of production order components by summing the expectedQtyBase column in the Prod Order Components table.\nData Source\n Prod Order Component\n#### Prod order component remaining qty. (base)\nFormula\n Calculates the total remaining quantity (in base units) of production order components by summing the remainingQtyBase column in the Prod Order Components table.\nData Source\n Prod Order Component\n## Prod order routing lines\n### Prod order routing measures\n #expected-operation-cost\n #operation-move-time\n #operation-run-time\n #operation-setup-time\n #operation-wait-time\n #posted-output-quantity\n #prod-order-routing-expected-capacity-need\n #prod-order-routing-expected-capacity-ovhd-cost\n #prod-order-routing-expected-operation-cost-amt\n #total-duration-days\n #total-duration-hours\n#### Expected operation cost\nFormula\n Calculates the total expected operational cost by using SUMX to iterate over the Prod Order Routing Lines table and summing the difference between Expected Operation Cost Amt. and Expected Capacity Ovhd. Cost for each row.\nData Source\n Prod Order Routing Line\n#### Operation move time\nFormula\n Calculates the total move time for production order routing lines by summing the Move Time column in the Prod Order Routing Lines table.\nData Source\n Prod Order Routing Line\n#### Operation run time\nFormula\n Calculates the total run time for production order routing lines by summing the Run Time column in the Prod Order Routing Lines table.\nData Source\n Prod Order Routing Line\n#### Operation setup time\nFormula\n Calculates the total setup time for production order routing lines by summing the Setup Time column in the Prod Order Routing Lines table.\nData Source\n Prod Order Routing Line\n#### Operation wait time\nFormula\n Calculates the total wait time for production order routing lines by summing the Wait Time column in the Prod Order Routing Lines table.\nData Source\n Prod Order Routing Line\n#### Posted output quantity\nFormula\n Sums Output Quantity column from the Capacity Ledger Entry table only for entries whose (Routing No., Order No., Operation No., Routing Reference No.) match the distinct Prod Order Routing Lines in the current filter context.\n#### Prod order routing expected capacity need\nFormula\n Calculates the total expected capacity requirement for production order routing lines by summing the Expected Capacity Need column in the Prod Order Routing Lines table.\nData Source\n Prod Order Routing Line\n#### Prod order routing expected capacity ovhd. cost\nFormula\n Calculates the total expected capacity overhead cost for production order routing lines by summing the Expected Capacity Ovhd. Cost column in the Prod Order Routing Lines table.\nData Source\n Prod Order Routing Line\n#### Prod order routing expected operation cost amt\nFormula\n Calculates the total expected operation cost amount for production order routing lines by summing the Expected Operation Cost Amt. column in the Prod Order Routing Lines table.\nData Source\n Prod Order Routing Line\n#### Total duration days\nFormula\n Calculates the total duration of production order routing lines in days by summing the Duration Total Days column in the Prod Order Routing Lines table. The Duration Total Days column is calculated in Power Query from the Starting Date Time and Ending Date Time fields on the Prod Order Routing Line.\nData Source\n Prod Order Routing Line\n#### Total duration hours\nFormula\n Calculates the total duration of production order routing lines in hours by summing the Duration Total Hours column in the Prod Order Routing Lines table. The Duration Total Hours column is calculated in Power Query from the Starting Date Time and Ending Date Time fields on the Prod Order Routing Line.\nData Source\n Prod Order Routing Line\n## Production order lines\n### Production order line measures\n #finished-quantity-base\n #quantity-base\n #remaining-quantity-base\n#### Finished quantity (base)\nFormula\n Calculates the total finished quantity in base units for production order lines by summing the finishedQtyBase column in the Production Order Lines table.\nData Source\n Prod. Order Line\n#### Quantity (base)\n Calculates the total quantity in base units for production order lines by summing the quantityBase column in the Production Order Lines table.\nData Source\n Prod. Order Line\n#### Remaining quantity (base)\nFormula\n Calculates the total remaining quantity in base units for production order lines by summing the remainingQtyBase column in the Production Order Lines table.\nData Source\n Prod. Order Line\n## Production orders\n### Production order measures\n #actual-time-used\n #average-production-time-per-finished-quantity\n #expected-production-order-scrap-quantity\n #finished-percent\n #no-of-production-orders\n #planned-quantity\n #production-order-scrap-quantity\n #remaining-percent\n #variance-quantity\n#### Actual time used\nFormula\n Sums quantity from Capacity Ledger Entries for production orders with a nonzero #finished-quantity, converting each entry's capacity unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors. It sums the results across production orders and returns blank when the result is zero.\nData Source\n Capacity Ledger Entry\n Production Order\n#### Average production time per finished quantity\nFormula\n Calculates the average time spent on production per finished quantity by dividing the #actual-time-used by the #finished-quantity.\nData Source\n Capacity Ledger Entry\n Production Order\n#### Expected production order scrap quantity\nFormula\n Calculates the expected scrap quantity for production orders by multiplying the #finished-quantity by the Prod Order Source No. Scrap % for the selected production order.\nData Source\n Production Order\n Item\n Item Ledger Entries\n#### Finished percent\nFormula\n Calculates the percentage of finished quantity relative to the planned quantity by dividing the #finished-quantity by the #planned-quantity.\nData Source\n Production Order\n Item Ledger Entry\n#### Finished quantity\nFormula\n Sums qty from Item Ledger Entries where Entry Type is Output, applying production order and order line filters to Production Order Lines and restricting those lines to Planning Level Code 0.\nData Source\n Production Order\n Item Ledger Entry\n Prod. Order Line\n#### No. of production orders\nFormula\n Counts nonblank entries in the Production Order column of Production Orders using COUNT, not a distinct count.\nData Source\n Production Order\n#### Planned quantity\nFormula\n Sums quantityBase from Production Order Lines.\nData Source\n Prod. Order Line\n#### Production order scrap quantity\nFormula\n Sums scrapQuantity from Capacity Ledger Entries, applying production order and order line filters to Production Order Lines and restricting those lines to Planning Level Code 0.\nData Source\n Capacity Ledger Entry\n Prod. Order Line\n#### Production order scrap percent\nFormula\n Divides #production-order-scrap-quantity by #finished-quantity.\nData Source\n Item Ledger Entry\n Capacity Ledger Entry\n Prod. Order Line\n#### Remaining percent\nFormula\n Calculates the remaining percentage of the planned quantity that hasn't been finished. It checks whether the #finished-quantity is less than the #planned-quantity. If it is, it returns the negative of the #variance-quantity divided by the #planned-quantity. If the finished quantity is greater than or equal to the planned quantity, it returns BLANK.\nData Source\n Item Ledger Entry\n Production Order\n#### Variance quantity\nFormula\n Subtracts #planned-quantity from #finished-quantity, indicating a surplus or deficit relative to the plan. Returns blank when the difference is zero.\nData Source\n Item Ledger Entry\n Production Order\n Prod. Order Line\n### Production order statistics\n#### Actual costs\n #actual-capacity-cost\n #actual-capacity-overhead-cost\n #actual-manufacturing-overhead-cost\n #actual-material-cost\n #actual-subcontracted-cost\n #total-actual-cost\n##### Actual capacity cost\nFormula\nCalculates the actual cost of capacity usage based on production order lines and related inventory adjustments. Here's a breakdown of the calculation:\n1. Variables for Production Order Details:\n The measure defines variables for the Production Order Number, Production Order Line Number, Item Number, and Production Order Status from the Production Order Lines table.\n2. Inventory Adjustment Lines:\n It then creates a table of relevant inventory adjustment lines that correspond to the current production order line, with the condition that the iSFinished status is set to TRUE if the production order status is Finished.\n3. Inventory Adjustment Details:\n The measure selects the order number, item number, and order line number from the inventory adjustment lines.\n4. Capacity Ledger Entries:\n It then filters the Capacity Ledger Entries table to match the Order No., Order Line No., and Item No. from the inventory adjustments and ensures Subcontracting is excluded.\n5. Return the Actual Capacity Cost:\n Finally, the measure calculates the sum of directCost from the Capacity Ledger Entries table, dividing it by the ShareOfCapCost measure to account for the specific share of capacity costs.\nThis complex calculation ties together various production and inventory details to derive the actual capacity cost for the production orders.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n##### Actual capacity overhead cost\nFormula\n Calculates the total overhead cost recorded in capacity ledger entries by summing the overheadCost column in the Capacity Ledger Entries table.\nData Source\n Capacity Ledger Entry\n##### Actual manufacturing overhead cost\nFormula\nCalculates the total overhead cost incurred during manufacturing by combining indirect cost percentages and per-unit overhead rates with actual production metrics. Here's how it works:\n1. IndirectCost:\n It sums the indirectCostPercent values across all production order lines.\n2. OverheadRate:\n It sums the overheadRate values across all production order lines.\n3. OutputQty:\n It calculates the total output quantity from the Item Ledger Entries table, filtered to include only entries of type \"Output\", and scoped to the currently selected production order.\n4. Final Calculation:\n The measure multiplies the sum of the following by the IndirectCost percentage (converted from percent to decimal), and then adds the product of OutputQty and OverheadRate.\n  #actual-material-cost\n  #actual-capacity-cost\n  #actual-subcontracted-cost\n  #actual-capacity-overhead-cost\nThis measure captures both proportional overhead based on other costs and fixed overhead based on output volume.\nData Sources\n Prod. Order Line\n Item Ledger Entry\n Capacity Ledger Entry\n Value Entry\n##### Actual material cost\nFormula\nCalculates the total material cost consumed in production by summing the costAmountActual from the Value Entries table, filtered to:\n Exclude entries where entryType is Rounding.\n Include only entries where Item Ledger Entry Type is Consumption.\nThe result is then multiplied by -1 to reflect material consumption as a cost.\nData Source\n Value Entry\n##### Actual subcontracted cost\nFormula\nCalculates the total direct cost of subcontracted work associated with production orders. Here's how it works:\n1. Context per Line:\n For each row in the Production Order Lines table, it defines key variables:\n  ProdOrderNo\n  ProdOrderLineNo\n  ProdOrderItem\n  ProdOrderStatus\n2. Inventory Adjustment Matching:\n It retrieves matching rows from Inventory Adjustment Entry Order Line, where:\n  THe order number, line number, and item match the production order line variables.\n  The iSFinished flag corresponds to whether the production order is marked as Finished.\n3. Subcontracted Capacity Ledger Entries:\n It then filters the Capacity Ledger Entries table to:\n  Match the order number, order line number, and item number from the inventory adjustment.\n  Include only entries where Subcontracting is TRUE.\n4. Cost Calculation:\n It calculates the total directCost from these filtered subcontracted capacity ledger entries and divides it by the ShareOfCapCost measure.\n5. Aggregation:\n SUMX iterates this logic over all production order lines, returning the total actual subcontracted cost.\nThis measure isolates and aggregates costs related to subcontracted operations.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n##### Total actual cost\nFormula\nCalculates the full cost of production by summing the following measures:\n #actual-material-cost\n #actual-capacity-cost\n #actual-subcontracted-cost\n #actual-capacity-overhead-cost\n #actual-manufacturing-overhead-cost\nThis measure provides a comprehensive view of all actual costs incurred during the production process.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Value Entry\n Item Ledger Entry\n#### Capacity need\n #prod-order-actual-capacity-need\n #prod-order-capacity-need-dev-percent\n #prod-order-capacity-need-variance\n #prod-order-expected-capacity-need\n #prod-order-expected-capacity-need-finished\n #prod-order-expected-capacity-need-non-finished\n##### Prod order actual capacity need\nFormula\nCalculates the actual capacity used for production orders, converted into the unit of measure specified in the manufacturing setup. Here's how it works:\n1. Manufacturing Time Factor:\n Retrieves the appropriate time factor from the Time Factors table based on the capacity unit defined in the Manufacturing Setup.\n2. Quantity Calculation (Qty variable):\n Iterates over filtered Capacity Ledger Entries (excluding subcontracting), and for each row:\n  Determines the Qty Per Capacity Unit of Measure (defaulting to 1 if zero).\n  Looks up the appropriate Time Factor:\n    If the Qty Per Capacity Unit of Measure is zero, it uses the time factor based on the work center's unit of measure. Otherwise, it uses the time factor based on the entry's own capacity unit.\n    Computes the adjusted quantity as `quantity / QtyPerCapUnitOfMeasure * TimeFactor`.\n3. Final Conversion:\n Divides the total adjusted quantity by the Manufacturing Time Factor to express it in the target unit.\nThis measure provides a standardized view of how much capacity was actually used, accounting for differences in units and time factors across capacity entries.\nData Source\n Capacity Ledger Entry\n Manufacturing Setup\n##### Prod order capacity need dev percent\nFormula\n Calculates the percentage deviation in capacity need by dividing the #prod-order-capacity-need-variance by the #prod-order-expected-capacity-need. This measure indicates how much the actual capacity usage differs from the expected need, expressed as a percentage.\nData Source\n Prod Order Routing Line\n Prod Order Capacity Need\n Capacity Ledger Entry\n Manufacturing Setup\n##### Prod order capacity need variance\nFormula\n Calculates the difference between the actual and expected capacity need for a production order by subtracting the #prod-order-expected-capacity-need from the #prod-order-actual-capacity-need. This measure quantifies how much more or less capacity was used than originally planned.\nData Sources\n Prod Order Routing Line\n Prod Order Capacity Need\n Capacity Ledger Entry\n Manufacturing Setup\n##### Prod order expected capacity need\nFormula\nReturns the appropriate expected capacity need based on the status of the production order:\n If the Prod Order Status is \"Finished\", it returns #prod-order-expected-capacity-need-finished.\n For all other statuses, it returns #prod-order-expected-capacity-need-non-finished.\nThe measure reflects different logic depending on whether the production order is completed or still in progress.\nData Source\n Prod Order Routing Line\n Prod Order Capacity Need\n Manufacturing Setup\n##### Prod order expected capacity need (finished)\nFormula\nCalculates the expected capacity required for finished production orders, adjusted to a standardized unit of measure. Here's how it works:\n1. Time Factor:\n Retrieves the time conversion factor from the Time Factors table based on the unit configured in the Manufacturing Setup.\n2. Expected Capacity Need:\n Sums the Expected Capacity Need from the Prod Order Routing Lines table, filtering for:\n  Production orders with status \"Finished\".\n  Work centers that are not subcontractors.\n3. Conversion:\n Divides the total expected capacity by the Time Factor to express the result in the standard capacity unit.\nThis measure provides a normalized view of planned capacity usage for completed production orders, excluding subcontracted operations.\nData Source\n Prod Order Routing Line\n Manufacturing Setup\n##### Prod order expected capacity need (non finished)\nFormula\nCalculates the expected capacity required for non-finished production orders, adjusted to a standardized unit of measure. Here's how it works:\n1. Time Factor:\n Retrieves the time conversion factor from the Time Factors table based on the unit defined in the Manufacturing Setup.\n2. Expected Capacity Need:\n Sums the neededTimeMs from the Prod Order Capacity Need table, filtering for:\n  Production orders with a status not equal to Finished.\n  Work centers that are not subcontractors. For example, Work Center Subcontractor No. is blank.\n3. Conversion:\n Divides the total neededTimeMs by the Time Factor to express the result in the standard capacity unit.\nThis measure provides a normalized view of the planned capacity usage for ongoing or unfinished production orders, excluding subcontracted operations.\nData Source\n Prod Order Capacity Need\n Manufacturing Setup\n#### Expected costs\n #expected-capacity-cost\n #expected-capacity-overhead-cost\n #expected-manufacturing-overhead-cost\n #expected-material-cost\n #expected-subcontracted-cost\n #total-expected-cost\n##### Expected capacity cost\nFormula\n Calculates the net expected cost of in-house capacity usage by subtracting #expected-subcontracted-cost from #expected-operation-cost.\nData Source\n Prod Order Line\n Prod Order Routing Line\n Prod Order Component\n##### Expected capacity overhead cost\nFormula\n Calculates the total overhead cost expected from capacity usage by summing the Expected Capacity Ovhd. Cost field from the Prod Order Routing Lines table. This represents the anticipated indirect costs associated with capacity operations in the production process.\nData Source\n Prod Order Routing Line\n##### Expected manufacturing overhead cost\nFormula\nThe Expected Manufacturing Overhead Cost measure calculates the total manufacturing overhead cost for a production order by:\n1. Retrieving Direct Cost:\n It uses the variable ExpMfgDirCost, which represents the expected manufacturing direct cost.\n  ExpMfgDirCost = #expected-material-cost + #expected-capacity-cost + #expected-subcontracted-cost + #expected-capacity-overhead-cost\n2. Iterating Over Production Order Lines:\n For each line, it adds:\n  The value of ExpOvhdCost: Calculated by iterating over each row in the Production Order Lines table. Multiplying the overheadRate by the quantityBase.\n  A percentage-based overhead component, calculated as the line's indirectCostPercent multiplied by the total ExpMfgDirCost, divided by 100.\n3. Summing the Result:\n SUMX aggregates the per-line overhead contributions into a total.\nData Source\n Prod. Order Line\n Prod Order Routing Line\n Prod Order Components\n##### Expected material cost\nFormula\n Calculates the total expected cost of materials for a production order by summing the costAmount field from the Prod Order Components table. This represents the projected material expense based on the components planned for use.\nData Source\n Prod Order Component\n##### Expected subcontracted cost\nFormula\nEstimates the portion of expected capacity cost attributed to subcontracted operations by:\n1. Identifying Subcontracting Work Centers:\n Filters the Work Center table to include only those with a Subcontractor No.. For example, subcontracted operations.\n2. Calculating Expected Operation Cost for Subcontracting:\n Computes #expected-operation-cost restricted to those subcontracting work centers.\n3. Determining Share of Total Capacity Cost:\n Retrieves the ShareOfTotalCapCost for the current production order from the Production Order Lines table.\n4. Final Calculation:\n Multiplies the Expected Operation Cost for Subcontracting by the order's share of total capacity cost.\nData Source\n Prod Order Line\n Prod Order Routing Line\n Prod Order Component\n##### Total expected cost\nCalculates the overall anticipated cost of a production order by summing the following components:\n #expected-material-cost\n #expected-capacity-cost\n #expected-subcontracted-cost\n #expected-capacity-overhead-cost\n #expected-manufacturing-overhead-cost\nThis measure provides a complete view of all expected production costs, combining direct and indirect, in-house and subcontracted expenses.\nData Source\n Prod Order Line\n Prod Order Routing Line\n##### Variance to expected cost\n #expected-capacity-cost-variance\n #expected-capacity-overhead-cost-variance\n #expected-manufacturing-overhead-cost-variance\n #expected-material-cost-variance\n #expected-subcontracted-cost-variance\n #total-expected-cost-variance\n###### Expected capacity cost variance\nFormula\n Calculates the difference between the #actual-capacity-cost and #expected-capacity-cost.\nData Source\n Prod Order Line\n Prod Order Routing Line\n Prod Order Component\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n###### Expected capacity overhead cost variance\nFormula\n Calculates the difference between #actual-capacity-overhead-cost and #expected-capacity-overhead-cost.\nData Source\n Capacity Ledger Entry\n Prod Order Routing Line\n###### Expected manufacturing overhead cost variance\nFormula\n Calculates the difference between #actual-manufacturing-overhead-cost and #expected-manufacturing-overhead-cost.\nData Source\n Prod. Order Line\n Item Ledger Entry\n Capacity Ledger Entry\n Value Entry\n Prod Order Routing Line\n Prod Order Component\n###### Expected material cost variance\nFormula\n Calculates the difference between #actual-material-cost and #expected-material-cost.\nData Source\n Value Entry\n Prod Order Component\n###### Expected subcontracted cost variance\nFormula\n Calculates the difference between #actual-subcontracted-cost and #expected-subcontracted-cost.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Prod Order Routing Line\n Prod Order Component\n###### Total expected cost variance\nFormula\nCalculates the overall difference between actual and expected costs by summing the following sub-measures:\n #expected-material-cost-variance\n #expected-capacity-cost-variance\n #expected-subcontracted-cost-variance\n #expected-capacity-overhead-cost-variance\n #expected-manufacturing-overhead-cost-variance\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Prod Order Routing Line\n Prod Order Component\n Value Entry\n Item Ledger Entry\n##### Variance to expected cost deviation %\n #expected-capacity-cost-dev-percent\n #expected-capacity-overhead-cost-dev-percent\n #expected-manufacturing-overhead-cost-dev-percent\n #expected-material-cost-dev-percent\n #expected-subcontracted-cost-dev-percent\n #total-expected-cost-dev-percent\n###### Expected capacity cost dev percent\nFormula\n Calculates the percentage deviation between actual and expected capacity cost by dividing #expected-capacity-cost-variance by #expected-capacity-cost.\nData Source\n Prod Order Line\n Prod Order Routing Line\n Prod Order Component\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n###### Expected capacity overhead cost dev percent\nFormula\n Calculates the percentage deviation between actual and expected capacity overhead costs by dividing #expected-capacity-overhead-cost-variance by #expected-capacity-overhead-cost.\nData Source\n Capacity Ledger Entry\n Prod Order Routing Line\n###### Expected manufacturing overhead cost dev percent\nFormula\n Calculates the percentage deviation between actual and expected manufacturing overhead costs by dividing #expected-manufacturing-overhead-cost-variance by #expected-manufacturing-overhead-cost.\nData Source\n Prod. Order Line\n Item Ledger Entry\n Capacity Ledger Entry\n Value Entry\n Prod Order Routing Line\n Prod Order Component\n###### Expected material cost dev percent\nFormula\n Calculates the percentage deviation between actual and expected material costs by dividing #expected-material-cost-variance by #expected-material-cost.\nData Source\n Value Entry\n Prod Order Component\n###### Expected subcontracted cost dev percent\nFormula\n Calculates the percentage deviation between actual and expected subcontracted costs by dividing the #expected-subcontracted-cost-variance by #expected-subcontracted-cost.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Prod Order Routing Line\n Prod Order Component\n###### Total expected cost dev percent\nFormula\n Calculates the overall percentage deviation between actual and expected total costs by dividing the #total-expected-cost-variance by the #total-expected-cost.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Prod Order Routing Line\n Prod Order Component\n Value Entry\n Item Ledger Entry\n#### Standard costs\n #standard-capacity-cost\n #standard-capacity-overhead-cost\n #standard-manufacturing-overhead-cost\n #standard-material-cost\n #standard-subcontracted-cost\n #total-standard-cost\n##### Standard capacity cost\nFormula\nCalculates the standard capacity cost for production order lines, using either item master data or finalized inventory adjustments:\n For each production order line:\n   If the line is fully invoiced, use the finished quantity multiplied by the single-level capacity cost from the inventory adjustment.\n   Otherwise, use the quantity Base from Production Order Lines multiplied by the Item Single-Level Capacity Cost from the Item Card.\nData Source\n Prod Order Line\n Inventory Adjmt. Entry (Order)\n Item\n##### Standard capacity overhead cost\nFormula\nCalculates the standard capacity overhead cost for each production order line, using either item master data or finalized inventory adjustments:\n For each production order line:\n   If fully invoiced, multiply the finished quantity by the single-level capacity overhead cost from the inventory adjustment entry.\n   Otherwise, use the quantity Base from Production Order Lines multiplied by the Item Single-Level Cap. Ovhd Cost from the Item Card.\nData Source\n Prod Order Line\n Inventory Adjmt. Entry (Order)\n Item\n##### Standard manufacturing overhead cost\nFormula\nCalculates the standard manufacturing overhead cost for each production order line, using either finalized inventory adjustment data or standard item-level overhead rates.\n For each production order line:\n   If the line is fully invoiced, multiply the finished quantity by the single-level manufacturing overhead cost from the inventory adjustment.\n   Otherwise, use the quantity Base from Production Order Lines multiplied by the Item Single-Level Mfg. Ovhd Cost from the Item Card.\nData Source\n Prod Order Line\n Inventory Adjmt. Entry (Order)\n Item\n##### Standard material cost\nFormula\nCalculates the standard material cost for each production order line based on either finalized inventory adjustments or item-level standard costs:\n For each production order line:\n   If the line is fully invoiced, multiply the finished quantity by the single-level material cost from the inventory adjustment entry.\n   Otherwise, use the quantity Base from Production Order Lines multiplied by the Item Single-Level Material Cost from the Item Card.\nData Source\n Prod Order Line\n Inventory Adjmt. Entry (Order)\n Item\n##### Standard subcontracted cost\nFormula\nCalculates the standard subcontracted cost for each production order line based on either finalized inventory adjustments or item-level standard costs:\n For each production order line:\n   If the line is fully invoiced, multiply the finished quantity by the single-level subcontracted cost from the inventory adjustment entry.\n   Otherwise, use the quantity Base from Production Order Lines multiplied by the Item Single-Level Subcontrd. Cost from the Item Card.\nData Source\n Prod Order Line\n Inventory Adjmt. Entry (Order)\n Item\n##### Total standard cost\nFormula\nSums up the various standard cost components associated with a production order. The measure calculates the total standard cost by adding up the following:\n #standard-material-cost\n #standard-capacity-cost\n #standard-capacity-overhead-cost\n #standard-manufacturing-overhead-cost\n #standard-subcontracted-cost\nData Source\n Prod Order Line\n Inventory Adjmt. Entry (Order)\n Item\n##### Variance to standard cost\n #standard-capacity-cost-variance\n #standard-capacity-overhead-cost-variance\n #standard-manufacturing-overhead-cost-variance\n #standard-material-cost-variance\n #standard-subcontracted-cost-variance\n #total-standard-cost-variance\n###### Standard capacity cost variance\nFormula\nCalculates the difference between the #actual-capacity-cost and #standard-capacity-cost.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Item\n###### Standard capacity overhead cost variance\nFormula\nCalculates the difference between the #actual-capacity-overhead-cost and #standard-capacity-overhead-cost.\nData Source\n Capacity Ledger Entry\n Prod Order Line\n Inventory Adjmt. Entry (Order)\n Item\n###### Standard manufacturing overhead cost variance\nFormula\nCalculates the difference between the #actual-manufacturing-overhead-cost and #standard-manufacturing-overhead-cost.\nData Source\n Prod. Order Line\n Item Ledger Entry\n Capacity Ledger Entry\n Value Entry\n Inventory Adjmt. Entry (Order)\n Item\n###### Standard material cost variance\nFormula\nCalculates the difference between the #actual-material-cost and #standard-material-cost.\nData Source\n Value Entry\n Prod Order Line\n Inventory Adjmt. Entry (Order)\n Item\n###### Standard subcontracted cost variance\nFormula\nCalculates the difference between the #actual-subcontracted-cost and #standard-subcontracted-cost.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Item\n###### Total standard cost variance\nFormula\nCalculates the total deviation from standard costs by summing the following individual variances:\n #standard-material-cost-variance\n #standard-capacity-cost-variance\n #standard-subcontracted-cost-variance\n #standard-capacity-overhead-cost-variance\n #standard-manufacturing-overhead-cost-variance\nData Source\n Prod. Order Line\n Item Ledger Entry\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Item\n Value Entry\n##### Variance to standard cost deviation %\n #standard-capacity-cost-dev-percent\n #standard-capacity-overhead-cost-dev-percent\n #standard-manufacturing-overhead-cost-dev-percent\n #standard-material-cost-dev-percent\n #standard-subcontracted-cost-dev-percent\n #total-standard-cost-dev-percent\n###### Standard capacity cost dev percent\nFormula\nCalculates the percentage deviation between the actual and standard capacity costs by dividing the #standard-capacity-cost-variance by the #standard-capacity-cost.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Item\n###### Standard capacity overhead cost dev percent\nFormula\nCalculates the percentage deviation between the actual and standard capacity overhead costs by dividing the #standard-capacity-overhead-cost-variance by the #standard-capacity-overhead-cost.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Item\n###### Standard manufacturing overhead cost dev percent\nFormula\nCalculates the percentage deviation between the actual and standard manufacturing overhead costs by dividing the #standard-manufacturing-overhead-cost-variance by the #standard-manufacturing-overhead-cost.\nData Source\n Prod. Order Line\n Item Ledger Entry\n Capacity Ledger Entry\n Value Entry\n Inventory Adjmt. Entry (Order)\n Item\n###### Standard material cost dev percent\nFormula\nCalculates the percentage deviation between the actual and standard material costs by dividing the #standard-material-cost-variance by the #standard-material-cost.\nData Source\n Prod. Order Line\n Value Entry\n Inventory Adjmt. Entry (Order)\n Item\n###### Standard subcontracted cost dev percent\nFormula\nCalculates the percentage deviation between the actual and standard subcontracted costs by dividing the #standard-subcontracted-cost-variance by the #standard-subcontracted-cost.\nData Source\n Prod. Order Line\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Item\n###### Total standard cost dev percent\nFormula\nCalculates the overall percentage deviation between actual and standard total costs by dividing the #total-standard-cost-variance by the #total-standard-cost.\nData Source\n Prod. Order Line\n Item Ledger Entry\n Capacity Ledger Entry\n Inventory Adjmt. Entry (Order)\n Item\n Value Entry\n## Value entries\n### Production order - WIP\n #beginning-balance-value\n #capacity-value\n #consumption-value\n #ending-balance-value\n #output-value\n#### Beginning balance value\nFormula\nCalculates the value of work in progress (WIP) by summing the cumulative values of:\n #consumption-value\n #capacity-value\n #output-value\nEach measure is filtered to include only transactions that occurred before the earliest date in the current filter context to provide the starting WIP balance.\nData Source\n Value Entry\n#### Capacity value\nFormula\nCalculates the total actual cost associated with capacity usage by summing the costAmountActual field from the Value Entries table where the Item Ledger Entry Type is Blank. This typically isolates capacity-related entries not linked to standard inventory transactions like consumption or output.\nData Source\n Value Entry\n#### Consumption value\nFormula\nNegates the sum of costAmountActual from Value Entries where Item Ledger Entry Type is Consumption and Entry Type is not Revaluation. Negating the consumption cost adds the consumed material's value to WIP.\nData Source\n Value Entry\n#### Ending balance value\nFormula\nCalculates the value of work in progress (WIP) at the end of the selected period by summing the following measures and rounding the result to five decimal places:\n #beginning-balance-value\n #consumption-value\n #capacity-value\n #output-value\nData Source\n Value Entry\n### Output value\nFormula\nCalculates the total negative value of actual and expected output costs by summing the costAmountActual and costAmountExpected fields from the Value Entries table for entries where:\n Item Ledger Entry Type is Output.\n entryType is Direct Cost.\nThen, the result is multiplied by -1 to reflect it as a cost deduction.\nData Source\n Value Entry\n### Value entry measures\n #cost-amount-actual\n #cost-amount-expected\n Cost Posted to G/L<#cost-posted-to-gl>\n #expected-cost\n Expected Cost Posted to G/L<#expected-cost-posted-to-gl>\n #item-ledger-entry-quantity\n #valued-quantity\n#### Cost amount actual\nFormula\n Calculates the total actual cost amount by summing the costAmountActual field from the Value Entries table.\nData Source\n Value Entry\n#### Cost amount expected\nFormula\n Calculates the total expected cost amount by summing the costAmountExpected field from the Value Entries table.\nData Source\n Value Entry\n#### Cost posted to G/L\nFormula\nCalculates the total cost amount posted to the General Ledger by summing the costPostedtoGL field from the Value Entries table.\nData Source\n Value Entry\n#### Expected cost\nFormula\nThe API's expectedCost field is a Boolean flag, exposed as Is Expected Cost in the semantic model, not an additive cost measure. For the expected cost amount, use #cost-amount-expected.\nData Source\n Value Entry\n#### Expected cost posted to G/L\nFormula\nCalculates the total expected cost posted to the general ledger by summing the expectedCostPostedtoGL field from the Value Entries table.\nData Source\n Value Entry\n#### Item ledger entry quantity\nFormula\nCalculates the total item ledger entry quantity by summing the itemLedgerEntryQuantity field from the Value Entries table.\nData Source\n Value Entry\n#### Valued quantity\nFormula\nCalculates the total valued quantity of items by summing the valuedQuantity field from the Value Entries table.\nData Source\n Value Entry\n## Work center\n### Work center measures\n #work-center-availability-after-orders\n #work-center-load\n #work-center-output\n #work-center-scrap\n #work-center-scrap-percent\n#### Work center availability after orders\nFormula\nCalculates the available capacity of a work center after considering the allocated time by subtracting the #work-center-allocated-time from the #work-center-capacity-effective.\nData Source\n Calendar Entry\n Prod Order Capacity Need\n#### Work center load\nFormula\nCalculates the load on a work center by dividing the #work-center-allocated-time by the #work-center-capacity-effective, providing the ratio of the allocated time to the available capacity.\nData Source\n Calendar Entry\n Prod Order Capacity Need\n#### Work center output\nFormula\nCalculates the total output quantity for a work center by summing the outputQuantity field from the Capacity Ledger Entries table, filtered where the Type is Work Center.\nData Source\n Capacity Ledger Entry\n#### Work center scrap\nFormula\n Calculates the total scrap quantity for a work center by summing the scrapQuantity field from the Capacity Ledger Entries table, filtered where the Type is Work Center.\nData Source\n Capacity Ledger Entry\n#### Work center scrap percent\nFormula\nCalculates the percentage of scrap relative to the total output for a work center by dividing the #work-center-scrap by the #work-center-output.\nData Source\n Capacity Ledger Entry\n### Work center statistics\n #work-center-actual-efficiency-percent\n #work-center-actual-need\n #work-center-actual-total-cost\n #work-center-allocated-time\n #work-center-capacity-effective\n #work-center-capacity-total\n #work-center-expected-efficiency-percent\n #work-center-needed-time\n#### Work center actual efficiency percent\nFormula\nCalculates the actual efficiency of a work center by dividing the #work-center-actual-need by the #work-center-capacity-total.\nData Source\n Capacity Ledger Entry\n Calendar Entry\n#### Work center actual need\nFormula\n Sums setupTime, runTime, and stopTime from Capacity Ledger Entries, converting each entry's capacity unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Capacity Ledger Entry\n#### Work center actual total cost\n Calculates the total actual cost for work centers by adding the #direct-cost and #overhead-cost measures.\nData Source\n Capacity Ledger Entry\n Value Entry\n#### Work center allocated time\nFormula\n Sums allocatedTime from Prod Order Capacity Need where Requested Only is FALSE, converting each work center's unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Prod Order Capacity Need\n#### Work center capacity (effective)\nFormula\n Sums Capacity Effective from Calendar Entries where Capacity Type is Work Center, converting each work center's unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Calendar Entry\n#### Work center capacity (total)\nFormula\n Sums Capacity Total from Calendar Entries where Capacity Type is Work Center, converting each work center's unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Calendar Entry\n#### Work center expected efficiency percent\nFormula\n Calculates the expected efficiency for work centers by dividing the #work-center-capacity-effective by the #work-center-capacity-total.\nData Source\n Calendar Entry\n#### Work center needed time\nFormula\n Sums neededTime from Prod Order Capacity Need where Requested Only is FALSE, converting each work center's unit of measure to the Show Capacity In unit from Manufacturing Setup, using Time Factors.\nData Source\n Prod Order Capacity Need\n## Related information\nTrack your business KPIs with Power BI goals<track-kpis-with-power-bi-metrics>\nPower BI Manufacturing app<manufacturing-powerbi-app>\nBuilt-in production reports<production-reports>\nManufacturing overview<production-manage-manufacturing>\nFind free e-learning modules for Business Central here<https://learn.microsoft.com/training/dynamics365/business-central>"}