{"title":"Power BI projects app KPIs and measures","url":"https://jonas-paprotka.de/docs/projects-powerbi-kpis/","by":"JOP-AL","license":"Copyright (c) Microsoft Corporation. CC BY 4.0, https://creativecommons.org/licenses/by/4.0/; code samples MIT. From https://learn.microsoft.com/en-us/dynamics365/business-central/projects-powerbi-kpis, MicrosoftDocs/dynamics365smb-docs at 46907ac (2026-11-19). Changed: includes filled in, links to this site, and for agents shortened without dropping a fact.","credit":"Microsoft Corporation, CC BY 4.0","origin":"https://learn.microsoft.com/en-us/dynamics365/business-central/projects-powerbi-kpis","source":{"name":"Business Central application docs","repo":"https://github.com/MicrosoftDocs/dynamics365smb-docs","commit":"46907ace177f8d31deba47a2fdb57c3336e66252","date":"2026-11-19"},"checked":"2026-11-19","description":"Explore project KPIs and measures in the Business Central Power BI Projects app semantic model, including formulas and the data used in calculations.","date":"2026-11-12","meta":{"topic":"reference"},"outline":[{"level":1,"title":"Power BI projects app KPIs and measures","slug":"power-bi-projects-app-kpis-and-measures","at":0,"chars":26639},{"level":2,"title":"Project measures","slug":"project-measures","at":641,"chars":1481},{"level":3,"title":"No. of completed projects","slug":"no-of-completed-projects","at":797,"chars":164},{"level":3,"title":"Project count","slug":"project-count","at":961,"chars":128},{"level":3,"title":"Tasks count","slug":"tasks-count","at":1089,"chars":170},{"level":3,"title":"Completed (%)","slug":"completed","at":1259,"chars":131},{"level":3,"title":"Invoiced (%)","slug":"invoiced","at":1390,"chars":136},{"level":3,"title":"Duration (days)","slug":"duration-days","at":1526,"chars":308},{"level":3,"title":"Realization (%)","slug":"realization","at":1834,"chars":139},{"level":3,"title":"Realization variance","slug":"realization-variance","at":1973,"chars":149},{"level":2,"title":"Obsolete project measures","slug":"obsolete-project-measures","at":2122,"chars":872},{"level":3,"title":"Actual profit","slug":"actual-profit","at":2151,"chars":219},{"level":3,"title":"Actual profit margin %","slug":"actual-profit-margin","at":2370,"chars":234},{"level":3,"title":"Budget profit","slug":"budget-profit","at":2604,"chars":133},{"level":3,"title":"Budget profit margin %","slug":"budget-profit-margin","at":2737,"chars":257},{"level":2,"title":"Project ledger measures","slug":"project-ledger-measures","at":2994,"chars":1255},{"level":3,"title":"Project ledger entry quantity","slug":"project-ledger-entry-quantity","at":3765,"chars":239},{"level":3,"title":"Project ledger line amount","slug":"project-ledger-line-amount","at":4004,"chars":245},{"level":2,"title":"Project invoiced cost","slug":"project-invoiced-cost","at":4249,"chars":915},{"level":3,"title":"G/L account invoiced cost","slug":"gl-account-invoiced-cost","at":4274,"chars":310},{"level":3,"title":"Item invoiced cost","slug":"item-invoiced-cost","at":4584,"chars":282},{"level":3,"title":"Resource invoiced cost","slug":"resource-invoiced-cost","at":4866,"chars":298},{"level":2,"title":"Project invoiced price","slug":"project-invoiced-price","at":5164,"chars":897},{"level":3,"title":"G/L account invoiced price","slug":"gl-account-invoiced-price","at":5190,"chars":305},{"level":3,"title":"Item invoiced price","slug":"item-invoiced-price","at":5495,"chars":273},{"level":3,"title":"Resource invoiced price","slug":"resource-invoiced-price","at":5768,"chars":293},{"level":2,"title":"Project invoiced profit","slug":"project-invoiced-profit","at":6061,"chars":514},{"level":3,"title":"G/L account invoiced profit","slug":"gl-account-invoiced-profit","at":6088,"chars":211},{"level":3,"title":"Item invoiced profit","slug":"item-invoiced-profit","at":6299,"chars":130},{"level":3,"title":"Resource invoiced profit","slug":"resource-invoiced-profit","at":6429,"chars":146},{"level":2,"title":"Project usage cost","slug":"project-usage-cost","at":6575,"chars":888},{"level":3,"title":"G/L account usage cost","slug":"gl-account-usage-cost","at":6597,"chars":302},{"level":3,"title":"Item usage cost","slug":"item-usage-cost","at":6899,"chars":274},{"level":3,"title":"Resource usage cost","slug":"resource-usage-cost","at":7173,"chars":290},{"level":2,"title":"Project usage price","slug":"project-usage-price","at":7463,"chars":881},{"level":3,"title":"G/L account usage price","slug":"gl-account-usage-price","at":7486,"chars":297},{"level":3,"title":"Item usage price","slug":"item-usage-price","at":7783,"chars":276},{"level":3,"title":"Resource usage price","slug":"resource-usage-price","at":8059,"chars":285},{"level":2,"title":"Project usage profit","slug":"project-usage-profit","at":8344,"chars":469},{"level":3,"title":"G/L account usage profit","slug":"gl-account-usage-profit","at":8368,"chars":193},{"level":3,"title":"Item usage profit","slug":"item-usage-profit","at":8561,"chars":118},{"level":3,"title":"Resource usage profit","slug":"resource-usage-profit","at":8679,"chars":134},{"level":2,"title":"Project ledger totals","slug":"project-ledger-totals","at":8813,"chars":1398},{"level":3,"title":"Total invoiced costs","slug":"total-invoiced-costs","at":8838,"chars":188},{"level":3,"title":"Total invoiced price","slug":"total-invoiced-price","at":9026,"chars":193},{"level":3,"title":"Total invoiced profit","slug":"total-invoiced-profit","at":9219,"chars":231},{"level":3,"title":"Total invoiced profit margin %","slug":"total-invoiced-profit-margin","at":9450,"chars":154},{"level":3,"title":"Total usage cost","slug":"total-usage-cost","at":9604,"chars":169},{"level":3,"title":"Total usage price","slug":"total-usage-price","at":9773,"chars":174},{"level":3,"title":"Total usage profit","slug":"total-usage-profit","at":9947,"chars":122},{"level":3,"title":"Total usage profit margin %","slug":"total-usage-profit-margin","at":10069,"chars":142},{"level":2,"title":"Obsolete project ledger measures","slug":"obsolete-project-ledger-measures","at":10211,"chars":2086},{"level":3,"title":"Actual (total price)","slug":"actual-total-price","at":10247,"chars":331},{"level":3,"title":"Billable (invoiced price)","slug":"billable-invoiced-price","at":10578,"chars":470},{"level":3,"title":"Invoiced (total cost)","slug":"invoiced-total-cost","at":11048,"chars":325},{"level":3,"title":"Invoiced (total price)","slug":"invoiced-total-price","at":11373,"chars":328},{"level":3,"title":"Quantity","slug":"quantity","at":11701,"chars":355},{"level":3,"title":"Total price","slug":"total-price","at":12056,"chars":241},{"level":2,"title":"Obsolete usage measures","slug":"obsolete-usage-measures","at":12297,"chars":1428},{"level":3,"title":"Actual (total cost)","slug":"actual-total-cost","at":12429,"chars":336},{"level":3,"title":"Gen. journal usage (total cost)","slug":"gen-journal-usage-total-cost","at":12765,"chars":330},{"level":3,"title":"Labour usage (total cost)","slug":"labour-usage-total-cost","at":13095,"chars":315},{"level":3,"title":"Material usage (total cost)","slug":"material-usage-total-cost","at":13410,"chars":315},{"level":2,"title":"Planning line measures","slug":"planning-line-measures","at":13725,"chars":2321},{"level":3,"title":"Planning line quantity","slug":"planning-line-quantity","at":14644,"chars":180},{"level":3,"title":"Planning line total cost (LCY)","slug":"planning-line-total-cost-lcy","at":14824,"chars":437},{"level":3,"title":"Planning line total price (LCY)","slug":"planning-line-total-price-lcy","at":15261,"chars":442},{"level":3,"title":"Total cost variance to budget","slug":"total-cost-variance-to-budget","at":15703,"chars":163},{"level":3,"title":"Total cost variance to budget %","slug":"total-cost-variance-to-budget-1","at":15866,"chars":180},{"level":2,"title":"Project billable costs","slug":"project-billable-costs","at":16046,"chars":1024},{"level":3,"title":"G/L account billable costs","slug":"gl-account-billable-costs","at":16072,"chars":346},{"level":3,"title":"Item billable costs","slug":"item-billable-costs","at":16418,"chars":318},{"level":3,"title":"Resource billable costs","slug":"resource-billable-costs","at":16736,"chars":334},{"level":2,"title":"Project billable price","slug":"project-billable-price","at":17070,"chars":1033},{"level":3,"title":"G/L account billable price","slug":"gl-account-billable-price","at":17096,"chars":349},{"level":3,"title":"Item billable price","slug":"item-billable-price","at":17445,"chars":321},{"level":3,"title":"Resource billable price","slug":"resource-billable-price","at":17766,"chars":337},{"level":2,"title":"Project billable profit","slug":"project-billable-profit","at":18103,"chars":521},{"level":3,"title":"G/L account billable profit","slug":"gl-account-billable-profit","at":18130,"chars":214},{"level":3,"title":"Item billable profit","slug":"item-billable-profit","at":18344,"chars":132},{"level":3,"title":"Resource billable profit","slug":"resource-billable-profit","at":18476,"chars":148},{"level":2,"title":"Project budget costs","slug":"project-budget-costs","at":18624,"chars":998},{"level":3,"title":"G/L account budget costs","slug":"gl-account-budget-costs","at":18648,"chars":338},{"level":3,"title":"Item budget costs","slug":"item-budget-costs","at":18986,"chars":310},{"level":3,"title":"Resource budget costs","slug":"resource-budget-costs","at":19296,"chars":326},{"level":2,"title":"Project budget price","slug":"project-budget-price","at":19622,"chars":1007},{"level":3,"title":"G/L account budget price","slug":"gl-account-budget-price","at":19646,"chars":341},{"level":3,"title":"Item budget price","slug":"item-budget-price","at":19987,"chars":313},{"level":3,"title":"Resource budget price","slug":"resource-budget-price","at":20300,"chars":329},{"level":2,"title":"Project budget profit","slug":"project-budget-profit","at":20629,"chars":491},{"level":3,"title":"G/L account budget profit","slug":"gl-account-budget-profit","at":20654,"chars":202},{"level":3,"title":"Item budget profit","slug":"item-budget-profit","at":20856,"chars":124},{"level":3,"title":"Resource budget profit","slug":"resource-budget-profit","at":20980,"chars":140},{"level":2,"title":"Totals for billables","slug":"totals-for-billables","at":21120,"chars":1030},{"level":3,"title":"Total billable cost","slug":"total-billable-cost","at":21144,"chars":191},{"level":3,"title":"Total billable price","slug":"total-billable-price","at":21335,"chars":193},{"level":3,"title":"Total billable profit","slug":"total-billable-profit","at":21528,"chars":135},{"level":3,"title":"Total budget cost","slug":"total-budget-cost","at":21663,"chars":179},{"level":3,"title":"Total budget price","slug":"total-budget-price","at":21842,"chars":181},{"level":3,"title":"Total budget profit","slug":"total-budget-profit","at":22023,"chars":127},{"level":2,"title":"Project purchase measures","slug":"project-purchase-measures","at":22150,"chars":1357},{"level":3,"title":"Amount on PO","slug":"amount-on-po","at":22285,"chars":162},{"level":3,"title":"Amount rcvd. not invoiced","slug":"amount-rcvd-not-invoiced","at":22447,"chars":214},{"level":3,"title":"Outstanding amt. on PO","slug":"outstanding-amt-on-po","at":22661,"chars":290},{"level":3,"title":"Purchase order count","slug":"purchase-order-count","at":22951,"chars":299},{"level":3,"title":"Quantity on PO","slug":"quantity-on-po","at":23250,"chars":257},{"level":2,"title":"Obsolete planning line measures","slug":"obsolete-planning-line-measures","at":23507,"chars":1685},{"level":3,"title":"Billable (total cost)","slug":"billable-total-cost","at":23542,"chars":380},{"level":3,"title":"Billable (total price)","slug":"billable-total-price","at":23922,"chars":383},{"level":3,"title":"Budget (total cost)","slug":"budget-total-cost","at":24305,"chars":441},{"level":3,"title":"Budget (total price)","slug":"budget-total-price","at":24746,"chars":446},{"level":2,"title":"Project task dates and durations","slug":"project-task-dates-and-durations","at":25192,"chars":1083},{"level":3,"title":"Project task starting date","slug":"project-task-starting-date","at":25343,"chars":174},{"level":3,"title":"Project task ending date","slug":"project-task-ending-date","at":25517,"chars":170},{"level":3,"title":"Project task duration days","slug":"project-task-duration-days","at":25687,"chars":299},{"level":3,"title":"Project task duration weeks","slug":"project-task-duration-weeks","at":25986,"chars":289},{"level":2,"title":"Related information","slug":"related-information","at":26275,"chars":364}],"text":"# Power BI projects app KPIs and measures\n> APPLIES TO: Generally available in Business Central 2024 release wave 2.\nThis page provides a list of all Key Performance Indicators (KPIs) included in the semantic model for the Power BI Projects report.\nExplore the list of KPIs below to learn more about how they can help you achieve your business goals.\nEach KPI is described, including how it is calculated and what data was used in the calculations.\n> TIP\n> You can easily track the KPIs that the Power BI reports display against your business objectives. See Track your business KPIs with Power BI metrics<track-kpis-with-power-bi-metrics>.\n## Project measures\n #no-of-completed-projects\n #project-count\n #tasks-count\n #invoiced-\n #completed-\n #duration-days\n #realization-\n #realization-variance\n### No. of completed projects\nFormula\nThe No. of Completed Projects measure calculates the number of projects where the Complete column is \"Yes\".\nData Sources\n Job\n### Project count\nFormula\nThe Project Count measure counts the total number of projects in the Project table.\nData Sources\n Job\n### Tasks count\nFormula\nThe Tasks Count measure counts the number of rows in the Tasks table where the Project Task Type has a value of \"Posting\".\nData Sources\n Job Task\n### Completed (%)\nFormula\nCompleted (%) = #total-usage-cost / #total-budget-cost\nData Sources\n Job Ledger Entry\n Job Planning Line\n### Invoiced (%)\nFormula\nInvoiced (%) = #total-invoiced-price / #total-billable-price\nData Sources\n Job Ledger Entry\n Job Planning Line\n### Duration (days)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Duration (Days) measure calculates the number of days between the earliest starting date and latest ending date for a given project in the Project table.\nData Sources\n Job\n### Realization (%)\nFormula\nRealization (%) = #total-billable-price / #total-usage-price\nData Sources\n Job Ledger Entry\n Job Planning Line\n### Realization variance\nFormula\nRealization Variance = #total-billable-price - #total-usage-price\nData Sources\n Job Ledger Entry\n Job Planning Line\n## Obsolete project measures\n### Actual profit\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nActual Profit = #total-invoiced-price - #total-usage-cost\nData Sources\n Job Ledger Entry\n### Actual profit margin %\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nActual Profit Margin % = #actual-profit / #total-invoiced-price\nData Sources\n Job Ledger Entry\n### Budget profit\nFormula\nBudget Profit = #total-budget-price - #total-budget-cost\nData Sources\n Job Ledger Entry\n Job Planning Line\n### Budget profit margin %\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nBudget Profit Margin % = #total-budget-profit / #total-budget-price\nData Sources\n Job Ledger Entry\n Job Planning Line\n## Project ledger measures\n #project-ledger-entry-quantity\n #project-ledger-line-amount\n G/L Account Invoiced Cost<#gl-account-invoiced-cost>\n #item-invoiced-cost\n #resource-invoiced-cost\n G/L Account Invoiced Price<#gl-account-invoiced-price>\n #item-invoiced-price\n #resource-invoiced-price\n G/L Account Invoiced Profit<#gl-account-invoiced-profit>\n #item-invoiced-profit\n #resource-invoiced-profit\n G/L Account Usage Cost<#gl-account-usage-cost>\n #item-usage-cost\n #resource-usage-cost\n G/L Account Usage Price<#gl-account-usage-price>\n #item-usage-price\n #resource-usage-price\n #total-invoiced-costs\n #total-invoiced-price\n #total-invoiced-profit\n #total-invoiced-profit-margin-\n #total-usage-cost\n #total-usage-price\n #total-usage-profit\n #total-usage-profit-margin-\n### Project ledger entry quantity\nFormula\nThe Project Ledger Entry Quantity measure aggregates the Qty. column of the Project Ledger Entry table. The sign is then inverted by multiplying by negative one.\nData Sources\n Project Ledger Entry\n### Project ledger line amount\nFormula\nThe Project Ledger Line Amount measure calculates the Project Ledger Line Amount by iterating over each Project Ledger Entry and multiplying Quantity by Unit Price (LCY).\nData Sources\n Project Ledger Entry\n## Project invoiced cost\n### G/L account invoiced cost\nFormula\nThe G/L Account Invoiced Cost calculates the total invoiced cost for G/L accounts used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the entry type is \"Sale\" and the type is \"G/L Account\".\nData Sources\n Job Ledger Entry\n### Item invoiced cost\nFormula\nThe Item Invoiced Cost calculates the total invoiced cost for items used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the entry type is \"Sale\" and the type is \"Item\".\nData Sources\n Job Ledger Entry\n### Resource invoiced cost\nFormula\nThe Resource Invoiced Cost calculates the total invoiced cost for resources used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the entry type is \"Sale\" and the type is \"Resource\".\nData Sources\n Job Ledger Entry\n## Project invoiced price\n### G/L account invoiced price\nFormula\nThe G/L Account Invoiced Price calculates the total invoiced price for G/L accounts used in a project. It uses the SUMX function to calculate the line amount for each entry where the entry type is \"Sale\" and the type is \"G/L Account\".\nData Sources\n Job Ledger Entry\n### Item invoiced price\nFormula\nThe Item Invoiced Price measure calculates the total invoiced price for items used in a project. It uses the SUMX function to calculate the line amount for each entry where Entry Type is Sale and Type is Item.\nData Sources\n Job Ledger Entry\n### Resource invoiced price\nFormula\nThe Resource Invoiced Price calculates the total invoiced price for resources used in a project. It uses the SUMX function to calculate the line amount for each entry where the entry type is \"Sale\" and the type is \"Resource\".\nData Sources\n Job Ledger Entry\n## Project invoiced profit\n### G/L account invoiced profit\nFormula\nG/L Account Invoiced Profit = G/L Account Invoiced Price<#gl-account-invoiced-price> - G/L Account Invoiced Cost<#gl-account-invoiced-cost>\nData Sources\n Job Ledger Entry\n### Item invoiced profit\nFormula\nItem Invoiced Profit = #item-invoiced-price - #item-invoiced-cost\nData Sources\n Job Ledger Entry\n### Resource invoiced profit\nFormula\nResource Invoiced Profit = #resource-invoiced-price - #resource-invoiced-cost\nData Sources\n Job Ledger Entry\n## Project usage cost\n### G/L account usage cost\nFormula\nThe G/L Account Usage Cost calculates the total usage cost for G/L accounts used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the entry type is \"Usage\" and the type is \"G/L Account\".\nData Sources\n Job Ledger Entry\n### Item usage cost\nFormula\nThe Item Usage Cost calculates the total usage cost for items used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the entry type is \"Usage\" and the type is \"Item\".\nData Sources\n Job Ledger Entry\n### Resource usage cost\nFormula\nThe Resource Usage Cost calculates the total usage cost for resources used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the entry type is \"Usage\" and the type is \"Resource\".\nData Sources\n Job Ledger Entry\n## Project usage price\n### G/L account usage price\nFormula\nThe G/L Account Usage Price calculates the total usage price for G/L accounts used in a project. It uses the SUMX function to calculate the line amount for each entry where the entry type is \"Usage\" and the type is \"G/L Account\".\nData Sources\n Job Ledger Entry\n### Item usage price\nFormula\nThe Item Usage Price calculates the total usage price for items used in a project. It uses the SUMX function to calculate the line amount for each entry where the entry type is \"Usage\" and the type is \"G/L Account\".\nData Sources\n Job Ledger Entry\n### Resource usage price\nFormula\nThe Resource Usage Price calculates the total usage price for resources used in a project. It uses the SUMX function to calculate the line amount for each entry where the entry type is \"Usage\" and the type is \"Resource\".\nData Sources\n Job Ledger Entry\n## Project usage profit\n### G/L account usage profit\nFormula\nG/L Account Usage Profit = G/L Account Usage Price<#gl-account-usage-price> - G/L Account Usage Cost<#gl-account-usage-cost>\nData Sources\n Job Ledger Entry\n### Item usage profit\nFormula\nItem Usage Profit = #item-usage-price - #item-usage-cost\nData Sources\n Job Ledger Entry\n### Resource usage profit\nFormula\nResource Usage Profit = #resource-usage-price - #resource-usage-cost\nData Sources\n Job Ledger Entry\n## Project ledger totals\n### Total invoiced costs\nFormula\nTotal Invoiced Costs = G/L Account Invoiced Cost<#gl-account-invoiced-cost> + #item-invoiced-cost + #resource-invoiced-cost\nData Sources\n Job Ledger Entry\n### Total invoiced price\nFormula\nThe Total Invoiced Price measure returns the absolute value of #project-ledger-line-amount for entries where Entry Type is Sale.\nData Sources\n Job Ledger Entry\n### Total invoiced profit\nFormula\nTotal Invoiced Profit = #total-invoiced-price + #total-invoiced-costs\nThe measure adds invoiced costs because sale entries normally store costs with a negative sign.\nData Sources\n Job Ledger Entry\n### Total invoiced profit margin %\nFormula\nTotal Invoiced Profit Margin % = #total-invoiced-profit / #total-invoiced-price\nData Sources\n Job Ledger Entry\n### Total usage cost\nFormula\nTotal Usage Costs = G/L Account Usage Cost<#gl-account-usage-cost> + #item-usage-cost + #resource-usage-cost\nData Sources\n Job Ledger Entry\n### Total usage price\nFormula\nTotal Usage Price = G/L Account Usage Price<#gl-account-usage-price> + #item-usage-price + #resource-usage-price\nData Sources\n Job Ledger Entry\n### Total usage profit\nFormula\nTotal Usage Profit = #total-usage-price - #total-usage-cost\nData Sources\n Job Ledger Entry\n### Total usage profit margin %\nFormula\nTotal Usage Profit Margin % = #total-usage-profit / #total-usage-price\nData Sources\n Job Ledger Entry\n## Obsolete project ledger measures\n### Actual (total price)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Actual (Total Price) measure sums Total Price (LCY) in the Project Ledger Entry table for entries where Entry Type is Usage, then multiplies the result by -1.\nData Sources\n Job Ledger Entry\n### Billable (invoiced price)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Billable (Invoiced Price) measure shows the total invoiced price of billable project entries by calculating the total price (in local currency) in the Project Ledger Entry table and selecting only those entries with an entry type of \"Sale\", which indicates that the project entry is billable.\nData Sources\n Job Ledger Entry\n### Invoiced (total cost)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Invoiced (Total Cost) measure calculates the total cost of all project ledger entries where the entry type is \"Sale\" in the Project Ledger Entry table.\nData Sources\n Job Ledger Entry\n### Invoiced (total price)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Invoiced (Total Price) measure calculates the total price of all project ledger entries where the entry type is \"Sale\" in the Project Ledger Entry table.\nData Sources\n Job Ledger Entry\n### Quantity\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Quantity measure calculates the total quantity of a product or service used in a project by summing the quantity in the Project Ledger Entry table and converting the measure to a positive value.\nData Sources\n Job Ledger Entry\n### Total price\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Total Price measure sums Total Price (LCY) in the Project Ledger Entry table.\nData Sources\n Job Ledger Entry\n## Obsolete usage measures\n #actual-total-cost\n #gen-journal-usage-total-cost\n #labour-usage-total-cost\n #material-usage-total-cost\n### Actual (total cost)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Actual (Total Cost) measure calculates the total cost (in local currency) of all project ledger entries where the type is \"Usage\" in the Project Ledger Entry table.\nData Sources\n Job Ledger Entry\n### Gen. journal usage (total cost)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Gen. Journal Usage (Total Cost) measure sums Total Cost (LCY) in the Project Ledger Entry table where Entry Type is Usage and Type is G/L Account.\nData Sources\n Job Ledger Entry\n### Labour usage (total cost)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Labour Usage (Total Cost) measure sums Total Cost (LCY) in the Project Ledger Entry table where Entry Type is Usage and Type is Resource.\nData Sources\n Job Ledger Entry\n### Material usage (total cost)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Material Usage (Total Cost) measure sums Total Cost (LCY) in the Project Ledger Entry table where Entry Type is Usage and Type is Item.\nData Sources\n Job Ledger Entry\n## Planning line measures\n #planning-line-quantity\n #planning-line-total-cost-lcy\n #planning-line-total-price-lcy\n #total-cost-variance-to-budget\n #total-cost-variance-to-budget-\n G/L Account Billable Costs<#gl-account-billable-costs>\n #item-billable-costs\n #resource-billable-costs\n G/L Account Billable Price<#gl-account-billable-price>\n #item-billable-price\n #resource-billable-price\n G/L Account Billable Profit<#gl-account-billable-profit>\n #item-billable-profit\n #resource-billable-profit\n G/L Account Budget Costs<#gl-account-budget-costs>\n #item-budget-costs\n #resource-budget-costs\n G/L Account Budget Price<#gl-account-budget-price>\n #item-budget-price\n #resource-budget-price\n G/L Account Budget Profit<#gl-account-budget-profit>\n #item-budget-profit\n #resource-budget-profit\n #total-billable-cost\n #total-billable-price\n #total-billable-profit\n #total-budget-cost\n #total-budget-price\n #total-budget-profit\n### Planning line quantity\nFormula\nThe Planning Line Quantity measure calculates the sum of the quantity column in the Project Planning Line table.\nData Sources\n Job Planning Line\n### Planning line total cost (LCY)\nFormula\nThe Planning Line Total Cost (LCY) measure calculates the total cost of all project planning lines in the Project Planning Line table. It uses the SUMX function to iterate over each row in the table and multiply the quantity and unit cost (in local currency) columns for each row. The results of each multiplication are then summed up to produce the total cost.\nData Sources\n Job Planning Line\n### Planning line total price (LCY)\nFormula\nThe Planning Line Total Price (LCY) measure calculates the total price of all project planning lines in the Project Planning Line table. It uses the SUMX function to iterate over each row in the table and multiply the quantity and unit price (in local currency) columns for each row. The results of each multiplication are then summed up to produce the total price.\nData Sources\n Job Planning Line\n### Total cost variance to budget\nFormula\nTotal Cost Variance to Budget = #total-usage-cost - #total-budget-cost\nData Sources\n Job Ledger Entry\n Job Planning Line\n### Total cost variance to budget %\nFormula\nTotal Cost Variance to Budget % = #total-cost-variance-to-budget / #total-budget-cost\nData Sources\n Job Ledger Entry\n Job Planning Line\n## Project billable costs\n### G/L account billable costs\nFormula\nThe G/L Account Billable Costs calculates the total billable cost for G/L accounts used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the line type is \"Billable\" or \"Both Budget and Billable\" and the type is \"G/L Account\".\nData Sources\n Job Planning Line\n### Item billable costs\nFormula\nThe Item Billable Costs calculates the total billable cost for items used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the line type is \"Billable\" or \"Both Budget and Billable\" and the type is \"Item\".\nData Sources\n Job Planning Line\n### Resource billable costs\nFormula\nThe Resource Billable Costs calculates the total billable cost for resources used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the line type is \"Billable\" or \"Both Budget and Billable\" and the type is \"Resource\".\nData Sources\n Job Planning Line\n## Project billable price\n### G/L account billable price\nFormula\nThe G/L Account Billable Price calculates the total billable amount for G/L accounts used in a project. It uses the SUM function to add up all entries by the Line Amount (LCY) column where the line type is \"Billable\" or \"Both Budget and Billable\" and the type is \"G/L Account\".\nData Sources\n Job Planning Line\n### Item billable price\nFormula\nThe Item Billable Price calculates the total billable amount for items used in a project. It uses the SUM function to add up all entries by the Line Amount (LCY) column where the line type is \"Billable\" or \"Both Budget and Billable\" and the type is \"Item\".\nData Sources\n Job Planning Line\n### Resource billable price\nFormula\nThe Resource Billable Price calculates the total billable amount for resources used in a project. It uses the SUM function to add up all entries by the Line Amount (LCY) column where the line type is \"Billable\" or \"Both Budget and Billable\" and the type is \"Resource\".\nData Sources\n Job Planning Line\n## Project billable profit\n### G/L account billable profit\nFormula\nG/L Account Billable Profit = G/L Account Billable Price<#gl-account-billable-price> - G/L Account Billable Costs<#gl-account-billable-costs>\nData Sources\n Job Planning Line\n### Item billable profit\nFormula\nItem Billable Profit = #item-billable-price - #item-billable-costs\nData Sources\n Job Planning Line\n### Resource billable profit\nFormula\nResource Billable Profit = #resource-billable-price - #resource-billable-costs\nData Sources\n Job Planning Line\n## Project budget costs\n### G/L account budget costs\nFormula\nThe G/L Account Budget Costs calculates the total budget cost for G/L accounts used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the line type is \"Budget\" or \"Both Budget and Billable\" and the type is \"G/L Account\".\nData Sources\n Job Planning Line\n### Item budget costs\nFormula\nThe Item Budget Costs calculates the total budget cost for items used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the line type is \"Budget\" or \"Both Budget and Billable\" and the type is \"Item\".\nData Sources\n Job Planning Line\n### Resource budget costs\nFormula\nThe Resource Budget Costs calculates the total budget cost for resources used in a project. It uses the SUM function to add up all entries by the Total Cost (LCY) column where the line type is \"Budget\" or \"Both Budget and Billable\" and the type is \"Resource\".\nData Sources\n Job Planning Line\n## Project budget price\n### G/L account budget price\nFormula\nThe G/L Account Budget Price calculates the total budget amount for G/L accounts used in a project. It uses the SUM function to add up all entries by the Line Amount (LCY) column where the line type is \"Budget\" or \"Both Budget and Billable\" and the type is \"G/L Account\".\nData Sources\n Job Planning Line\n### Item budget price\nFormula\nThe Item Budget Price calculates the total budget amount for items used in a project. It uses the SUM function to add up all entries by the Line Amount (LCY) column where the line type is \"Budget\" or \"Both Budget and Billable\" and the type is \"Item\".\nData Sources\n Job Planning Line\n### Resource budget price\nFormula\nThe Resource Budget Price calculates the total budget amount for resources used in a project. It uses the SUM function to add up all entries by the Line Amount (LCY) column where the line type is \"Budget\" or \"Both Budget and Billable\" and the type is \"Resource\".\nData Sources\n Job Planning Line\n## Project budget profit\n### G/L account budget profit\nFormula\nG/L Account Budget Profit = G/L Account Budget Price<#gl-account-budget-price> - G/L Account Budget Costs<#gl-account-budget-costs>\nData Sources\n Job Planning Line\n### Item budget profit\nFormula\nItem Budget Profit = #item-budget-price - #item-budget-costs\nData Sources\n Job Planning Line\n### Resource budget profit\nFormula\nResource Budget Profit = #resource-budget-price - #resource-budget-costs\nData Sources\n Job Planning Line\n## Totals for billables\n### Total billable cost\nFormula\nTotal Billable Cost = G/L Account Billable Costs<#gl-account-billable-costs> + #item-billable-costs + #resource-billable-costs\nData Sources\n Job Planning Line\n### Total billable price\nFormula\nTotal Billable Price = G/L Account Billable Price<#gl-account-billable-price> + #item-billable-price + #resource-billable-price\nData Sources\n Job Planning Line\n### Total billable profit\nFormula\nTotal Billable Profit = #billable-total-price - #billable-total-cost\nData Sources\n Job Planning Line\n### Total budget cost\nFormula\nTotal Budget Cost = G/L Account Budget Costs<#gl-account-budget-costs> + #item-budget-costs + #resource-budget-costs\nData Sources\n Job Planning Line\n### Total budget price\nFormula\nTotal Budget Price = G/L Account Budget Price<#gl-account-budget-price> + #item-budget-price + #resource-budget-price\nData Sources\n Job Planning Line\n### Total budget profit\nFormula\nTotal Budget Profit = #total-budget-price - #total-budget-cost\nData Sources\n Job Planning Line\n## Project purchase measures\n #amount-on-po\n #amount-rcvd-not-invoiced\n #outstanding-amt-on-po\n #purchase-order-count\n #quantity-on-po\n### Amount on PO\nFormula\nThe Amount on PO measure calculates the sum of the amount (in local currency) column in the Purchases table.\nData Sources\n Purchase Line\n### Amount rcvd. not invoiced\nFormula\nThe Amount Rcvd. Not Invoiced measure calculates the total amount of purchases that have been received but not yet invoiced in the Purchases table.\nData Sources\n Purchase Line\n### Outstanding amt. on PO\nFormula\nThe Outstanding Amt. on PO measure sums the amount in the Purchases table for outstanding purchase lines linked to projects. The source query includes order and invoice lines where Outstanding Qty. (Base) is greater than zero.\nData Sources\n Purchase Line\n### Purchase order count\nFormula\nThe Purchase Order Count measure calculates the total number of purchase orders in the Purchases table. It uses the CALCULATE function to filter the table and returns the distinct count of the \"Document No.\" column for the filtered rows.\nData Sources\n Purchase Line\n### Quantity on PO\nFormula\nThe Quantity on PO measure calculates the total quantity of items ordered in the Purchases table. It uses the SUM function to add up all the values in the Quantity (Base) column and returns the result.\nData Sources\n Purchase Line\n## Obsolete planning line measures\n### Billable (total cost)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Billable (Total Cost) measure calculates the total cost (in local currency) of all project planning lines where the line type is \"Billable\" or \"Both Budget and Billable\" in the Project Planning Line table.\nData Sources\n Job Planning Line\n### Billable (total price)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Billable (Total Price) measure calculates the total price (in local currency) of all project planning lines where the line type is \"Billable\" or \"Both Budget and Billable\" in the Project Planning Line table.\nData Sources\n Job Planning Line\n### Budget (total cost)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Budget (Total Cost) measure represents the budgeted cost of resources to be used in a project by calculating the total cost (in local currency) in the Project Planning Line table and selecting only those lines with a line type of \"Budget\" or \"Both Budget and Billable\".\nData Sources\n Job Ledger Entry\n### Budget (total price)\n> NOTE\n> This measure is deprecated in Business Central 2025 release wave 2 and is no longer available.\nFormula\nThe Budget (Total Price) measure represents the budgeted price of resources to be used in a project by calculating the total price (in local currency) in the Project Planning Line table and selecting only those lines with a line type of \"Budget\" or \"Both Budget and Billable\".\nData Sources\n Job Planning Line\n## Project task dates and durations\n #project-task-duration-days\n #project-task-duration-weeks\n #project-task-starting-date\n #project-task-ending-date\n### Project task starting date\nThis calculated column returns the earliest Planning Date from the project planning lines related to the task.\nData sources\n Job Planning Line\n### Project task ending date\nThis calculated column returns the latest Planning Date from the project planning lines related to the task.\nData sources\n Job Planning Line\n### Project task duration days\nFormula\nThe Project Task Duration Days measure calculates the duration of a project task in days by finding the earliest and latest planning dates from related Project Planning Lines, then returning the day difference between them.\nData Sources\n Project Planning Line\n### Project task duration weeks\nFormula\nThe Project Task Duration Weeks measure calculates the duration of a project task in weeks by taking the earliest and latest planning dates from related Project Planning Lines, then returning the week difference.\nData Sources\n Project Planning Line\n## Related information\nTrack your business KPIs with Power BI goals<track-kpis-with-power-bi-metrics>\nPower BI Projects app<projects-powerbi-app>\nBuilt-in Projects reports<project-reports>\nProject management overview<projects-manage-projects>\nFind free e-learning modules for Business Central here<https://learn.microsoft.com/training/dynamics365/business-central>"}