This article takes you through the steps to use the Contoso Coffee demo data in flushing.
Scenario for flushing AutoDrip components and operations
You're the production planner at Contoso Coffee. You must create a new production order for five units of item SP-SCM1004, AutoDrip. Some components and operations are forward flushed, others backward flushed based on different conditions.
Post automatic and manual consumption and output
Before you begin, generate the Manufacturing demo data. The walkthrough uses item SP-SCM1004, its production BOM and routing SP-SCM1004, and the default manufacturing location MAIN.
Opening component inventory is posted on June 1 of the configured starting year. Use production and posting dates on or after that date.
The demo data configures machine center 130 for forward flushing, 110 for manual flushing, and 230 for backward flushing. On the production BOM, routing link code 100 links the control panel display and buttons to the electrical wiring operation. These settings explain why some consumption follows operation output rather than the production order quantity.
Create a firm planned production order for five units of the item SP-SCM1004, AutoDrip at location MAIN. Learn more in Create a firm planned production order and change it. Use dates on or after the opening inventory date rather than the April dates in that walkthrough.
Release the production order.
Choose the Change Status action.
In the page that appears, set the New Status field to Released, and then choose the Yes button.
A message that has a status bar appears and references automatic consumption. This message is followed by a confirmation message that the order is changed to have the status Released.
Choose the OK button to close the confirmation message.
Review the item and capacity ledger entries for the production order.
Select Search (Alt+Q) in the upper-right corner, enter Released Production Order, and then choose the related link.
Open the production order with the 5 units of the AutoDrip coffee machine.
Choose the Item Ledger Entries action.
The item SP-BOM1305, Screw Hex M3, Zinc is flushed immediately with the full expected quantity. The BOM requires 12 screws per AutoDrip, so the expected consumption for five units is 60. Close the Item Ledger Entries page.
Choose the Capacity Ledger Entries action. A body assembly operations entry was also completed when the order was released. Close the Capacity Ledger Entries page.
You can manually flush component items by using a consumption or production journal. Manual flushing allows you to adjust quantity before posting. For example, if more quantity is needed to cover a low quality of raw materials.
Flush components manually.
Select Search (Alt+Q) in the upper-right corner, enter Consumption Journal, and then choose the related link.
Choose the Calc. Consumption action.
In the Calc. Consumption request page, on the Production Order FastTab, define a filter for the specific order in the Order No. field, and then choose the OK button. After the batch job request page closes, the Consumption Journal page shows the components that require manual consumption.
Choose the Post action. Close the consumption journal.
Manually register output for electrical wiring.
You must manually fill in the Run Time field. You can also specify the quantity and scrap that was produced. Enter 3 as the output quantity and post the output.
Select Search (Alt+Q) in the upper-right corner, enter Output Journal, and then choose the related link.
On the Output Journal page, create a new journal line.
In the Order No. field, specify the order.
Choose the Explode Routing action.
The Output Journal page shows the operation line only for electrical wiring.
In the Run Time field, enter 10.
Change the Quantity field from 5 to 3.
Choose Post.
Close the output journal.
Review the item ledger entries for the production order.
- On the page for the production order, choose the Item Ledger Entries action.
The item SP-BOM1302, Control panel display is posted with a quantity of 3, based on the actual output. SP-BOM1303, Button is posted with the full expected quantity of 10, because the BOM requires two buttons per AutoDrip. Close the Item Ledger Entries page.
Finish the production order.
Choose the Change Status action.
In the page that appears, choose Finished in the New Status field, and then choose the Yes button.
A message displays with a status bar that reflects the automatic consumption. This message is followed by a confirmation message that the order is changed to an order with the status Finished. The finished production order has the same number as it had as with the status Released.
Choose the OK button to close the confirmation message.
Review the item and capacity ledger entries for the production order again.
Choose the Capacity Ledger Entries action.
The packing operations entry was completed when the order was finished. The produced (output) quantity is 5, regardless of the output of the previous step. Close the Capacity Ledger Entries page.
Choose the Item Ledger Entries action.
The quantity in the item ledger entry of type Output is equal to the output quantity in the capacity ledger entry. The consumed quantity of SP-BOM1301, Housing AutoDrip, and SP-BOM1304, Stainless steel thermal carafe is 5 for both because the expected output and the actual output are the same.
Close the Item Ledger Entries page.
That's it for manual and automatic flushing of components.
Related information
Flush Components According to Operation Output