Inspect subcontracted production operations

Create quality inspections when you receive subcontracted production work. Use a production-output inspection rule to inspect the work recorded against the production operation.

In this Contoso Coffee walkthrough, a subcontractor assembles two Airpot Duo units. Use item SP-SCM1011 and the existing SP-SCM1009-SUB-F routing, which has one final assembly operation. Inspect the finished output separately for each serial number.

Prerequisites

Use a demonstration company with the Premium experience and the Quality Management and Subcontracting apps installed. Enable the Subcontracting app functionality and use the default quality management settings. Generate the Quality Management and Manufacturing Contoso Coffee modules. The Manufacturing module supplies item SP-SCM1011, routing SP-SCM1009-SUB-F, work center 600, and vendor 83000. Learn more in Set up Contoso Coffee demo data for quality management.

You need the Quality Admin & Supervisor permission set and standard access to the manufacturing and subcontracting processes.

The production order, purchase orders, and inspections use their configured number series. Note their generated numbers as you work through the steps.

Prepare the item

  1. Open the Items page, and then open SP-SCM1011, Airpot Duo.
  2. In the Routing No. field, choose SP-SCM1009-SUB-F.

Prepare the inspection template

  1. Open the Quality Tests page, and then create a Boolean test named SUBCFINAL with the description Finished unit functional.
  2. In the Pass Condition field, choose Yes and set Pass Description to PASS.
  3. Open the Quality Inspection Templates page, and then create SUBC-FINAL. Add the test SUBCFINAL.

Learn more about configuring tests and sampling in Create quality inspection templates.

Configure inspections for subcontracting output

Receiving a subcontracting purchase order posts output for the linked production operation. A subcontracting purchase receipt isn't the same as receiving a purchased inventory item, even though you post it from a purchase order. Configure Production Order Trigger, rather than a purchase-receipt trigger, for this walkthrough.

Create the generation rule

Use Prod. Order Routing Line as the source table. Its Subcontracting field identifies operations whose work center has a subcontractor.

  1. On template SUBC-FINAL, choose the Inspection Generation Rules action, and then create a rule.
  2. In the Intent field, choose Production and set Table to Prod. Order Routing Line.
  3. Use the Condition Filter to set Routing No. to SP-SCM1009-SUB-F and Subcontracting to Yes.
  4. Use the Item Filter to set No. to SP-SCM1011.
  5. In the Activation Trigger field, choose Automatic only.
  6. In the Production Order Trigger field, choose When Production Output is posted.

Create the production order

  1. Select Search (Alt+Q) in the upper-right corner, enter Released Production Orders, and then choose the related link.

  2. Choose the New action, and then enter the following values.

    FieldValue
    Source TypeItem
    Source No.SP-SCM1011, Airpot Duo
    Quantity2
    Location CodeMAIN
  3. Choose the Refresh Production Order action, and then confirm the refresh.

  4. Select the production order line, and then choose the Routing action.

  5. Verify routing SP-SCM1009-SUB-F with operation 10 as its only operation. The Subcontracting field must be Yes.

Receive and inspect the last operation with serial numbers

  1. On the production order routing, select operation 10, and then choose the Create Subcontracting Order action.

  2. Open the new purchase order. Verify vendor 83000, the linked production order, and quantity 2. Note the purchase order number.

  3. Select the subcontracting purchase line, and then choose the Item Tracking Lines action. Enter serial numbers SN-001 and SN-002 on separate lines. On each tracking line, enter 1 in Quantity (Base) and verify Qty. to Handle (Base) of 1. Verify that the total assigned quantity is 2.

  4. On the subcontracting purchase line, enter 2 in Qty. to Receive.

  5. Choose the Post action, choose Receive, and then confirm the posting.

  6. On the production order routing, choose Show Quality Inspections. The list is filtered to the production order.

  7. Verify that two inspections use template SUBC-FINAL and operation 10.

    Serial numberQuantity (Base)
    SN-0011
    SN-0021
  8. On each inspection, record Yes for SUBCFINAL, and then choose the Finish action. Verify Passed Quantity of 1 for each unit.

  9. Open Item Ledger Entries, and then filter to the production order. Verify output of 1 for each of the two serial numbers.

Review the results

You received two serial-tracked Airpot Duo units from the subcontractor and created one inspection for each unit.

An inspection doesn't automatically block a transaction while the inspection is open or fails. Configure and validate any blocking or inventory workflow separately. Learn more in Quality management workflows.

Set up Contoso Coffee demo data for quality management
Set up quality inspection generation rules
Order subcontracting
Process items that failed a quality inspection

Find free e-learning modules for Business Central here